Laserfiche WebLink
(1) 10 AWG THHN/THWN-2,CU.,BUCK(U) 12-1 A AC (1) 10-2 OF-B W/G,THHN/THWN-2.SOLID CU MAX 12 1 A A (1) 10-2 UF•B(or NM)W/G.THHN/THWN-2.SO MAX 12 1 A A (1) 12.2 TC-ER.THHN/THWN-2,CU MAX 12.1 A AC <br /> 15 (1) 10 AWG THHN/THWN-2,CU.,RED(12) 200 V AC 3 240 V A 2 240 V A 1 (1) 6 AWG BARE,CU(EGC) 240 V AC <br /> (1) 10 AWG THHN/THWN•2,CU.,WHITE(N) <br /> (3) 10 AWG THHN/THWN-2,CU..GREEN(EGC) <br /> I) 3/4 INCH EMT EXTERIOR (1) 3/4 INCH EMT EXTERIOR INTERIOR EXTERIOR BLUE RAVEN <br /> 1403 N. Research Way <br /> Orem, UT 84097 <br /> 800.377.4480 <br /> W W W.BLUERAVENSOLAR.COM <br /> DESIGNER NOTES: ELECTRICAL NOTES: CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> LOAD SIDE BREAKER IN MSP INTERIOR POI,PLEASE COMBINE 2 15A BREAKERS INTO 1 DUPLEX BREAKER TO MAKE ROOM FOR THE PV BREAKER ALL INTERIOR CONDUIT MUST BE SCH 80 PVC. USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> IN PART TO OTHERS OUTSIDE <br /> RECIPIENTS ORGANIZATION,EXCEPT <br /> ENPHASE IQ COMBINER 4 IN CONNECTION WITH THE SALE AND <br /> (E)200A MAIN SERVICE PANEL X-IQ-AM1-240-4 USE OF THE RESPECTIVE EQUIPMENT, <br /> (E)200A/2P MAIN BREAKER (SOLAR LOAD ONLY) WITHOUT THE WRITTEN PERMISSION <br /> OF BLUE RAVEN SOLAR LLC. <br /> PV AC DISCONNECT <br /> (E)200A/2P NON-FUSED <br /> L1 LOCKABLE,VISIBLE OPEN <br /> L2 30A,240V,2-POLE (10)Wells Q.PEAK DUO BLK ML-G10+395 NABCEP <br /> N <br /> UL 1703 COMPLIANT <br /> (E)LOADS *PV BREAKER TO BE LOCATED ENVOY (10) Enphase IQ8PLUS-72-2-US CERTIFIED <br /> AT OPPOSITE END OF BUSSING15A/2P UL 1741 COMPLIANT <br /> FROM MAIN BREAKER 4"x4"x4"PVC JB-1 EZ SOLAR <br /> �EN JUNCTION BOX JUNCTION BOX PV INSTALLATION <br /> (N)20A/2P L (N)20A/2P L JB �L, JB--']Ll (1) CIRCUIT OF PROFESSIONAL <br /> Ll <br /> L2 L2 — — <br /> L2 L2 L2 Scott Gurney <br /> NEGC N — I�F <br /> --- EGC _EGC �___EGC _ 10 MODULES #PV-011719-015866 <br /> --- ---------------------------------------- --- ------------------------ — L -- <br /> 120/240 VAC N 1s 15 --J 3 2 1 CONTRACTOR: <br /> 60HZ BRS FIELD OPS <br /> *JUNCTION BOX <br /> 1 PHASE OPTIONAL IF OF-B 800-377-4480 <br /> TO UTILITY <br /> GRID I CABLE USED FOR <br /> G J ENTIRE HOMERUN <br /> I U <br /> I .. <br /> I Z Q <br /> I <br /> (E)GROUNDING O (o <br /> ELECTRODE(S) N Y L0 <br /> 00 C0 rn rn <br /> C\i M <br /> Oo w <br /> LL 70 01 NN <br /> z p 3 -S� to in <br /> • 3 Q U) <br /> • LU <br /> 0 LU <br /> C) 4 W U) <br /> If _ :3 Cam > UU <br /> C� ZL5W Qo <br /> DRAWING BY: <br /> PremiumCAD <br /> PLOT DATE: <br /> December 14, 2022 <br /> INTERCONNECTION NOTES <br /> ' PROJECT NUMBER: <br /> 705.12(8)(3)THE FOLLOWING METHOD(S)SHALL BE USED TO 673451 <br /> DETERMINE THE RATINGS OF BUSBARS: (2)WHERE TWO SOURCES, <br /> ONE A PRIMARY POWER SOURCE AND THE OTHER ANOTHER POWER + r SHEET NAME: <br /> SOURCE,ARE LOCATED AT OPPOSITE ENDS OF A BUSBAR THAT <br /> CONTAINS LOADS, THE SUM OF 125 PERCENT OF THE ELECTRICAL <br /> POWER-SOURCE(S)OUTPUT CIRCUIT CURRENT AND THE RATING OF <br /> THE OVERCURRENT DEVICE PROTECTING THE BUS BAR SHALL NOT REVISION: PAGE NUMBER: <br /> EXCEED 120 PERCENT OF THE AMPACITY OF THE BUSBAR. UTILITY COMPANY: Snohomish County Public Utilities District (PUD) PERMIT ISSUER: City of Everett 0 PV5 <br />