Laserfiche WebLink
GENERAL NOTES AERIAL VIEW <br /> CODE AND STANDARDS <br /> 1.ALL WORK SHALL COMPLY WITH 2017 NATIONAL ELECTRIC CODE(NEC),2015 INTERNATIONAL BUILDING CODE . BLUE RAVEN <br /> (IBC),2015 INTERNATIONAL RESIDENTIAL CODE(IRC),2015 INTERNATIONAL PLUMBING CODE(IPC),AND ALL STATE . ~". j <br /> AND LOCAL BUILDING,ELECTRICAL,AND PLUMBING CODES. N <br /> 2.DRAWINGS HAVE BEEN DETAILED ACCORDING TO UL LISTING REQUIREMENTS. ; t <br /> 1403 N. Research Way <br /> SITE NOTES/OSHA REGULATION Orem, UT 84097 <br /> 1.A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. 800.377.4480 <br /> 2.THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY INTERACTIVE SYSTEM. WWW.BLUERAVENSOLAR.COM <br /> 3.THE SOLAR PV INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING,MECHANICAL,OR BUILDING ROOF VENTS. <br /> 4.ROOF COVERINGS SHALL BE DESIGNED,INSTALLED,AND MAINTAINED IN ACCORDANCE WITH THIS CODE AND CONFIDENTIAL-THE INFORMATION <br /> THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF COVERING SHALL SERVE TO PROTECT t HEREIN CONTAINED SHALL NOT BE <br /> THE BUILDING OR STRUCTURE. USED FOR THE BENEFIT OF ANYONE <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> SOLAR CONTRACTOR - IN PART TO OTHERS OUTSIDE <br /> 1.MODULE CERTIFICATIONS WILL INCLUDE UL1703,IEC61646,IEC61730. RECIPIENTS ORGANIZATION,EXCEPT <br /> 2.IF APPLICABLE,MODULE GROUNDING LUGS MUST BE INSTALLED AT THE MARKED GROUNDING LUG HOLES PER IN CONNECTION WITH THE SALE AND <br /> THE MANUFACTURER'S INSTALLATION REQUIREMENTS. USE OF THE RESPECTIVE EQUIPMENT, <br /> 3.AS INDICATED BY DESIGN,OTHER NRTL LISTED MODULE GROUNDING DEVICES MAY BE USED IN PLACE OF ` WITHOUT THE WRITTEN PERMISSION <br /> STANDARD GROUNDING LUGS AS SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. �# OF BLUE RAVEN SOLAR LLC. <br /> 4.CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO <br /> LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. <br /> 5.CONDUIT POINT OF PENETRATION FROM EXTERIOR TO INTERIOR TO BE INSTALLED AND SEALED WITH A . NAB C E P <br /> SUITABLE SEALING COMPOUND. <br /> 6.DC WIRING LIMITED TO MODULE FOOTPRINT W/ENPHASE AC SYSTEM. • CERTIFIED <br /> 7.ENPHASE WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY W/SUITABLE WIRING CLIPS. �\ • i V , I I V� <br /> 8.MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP COEFFICIENT FOR VOC UNLESS NOT I , ` � —'.� G PV INSTALLATION <br /> AVAILABLE. <br /> 9.ALL INVERTERS,MOTOR GENERATORS,PHOTOVOLTAIC MODULES,PHOTOVOLTAIC PANELS,AC ♦ `r �_ a PROFESSIONAL <br /> PHOTOVOLTAIC MODULES,DC COMBINERS,DC-TO-DC CONVERTERS,SOURCE CIRCUIT COMBINERS,AND O Scott Gurney <br /> CHARGE CONTROLLERS INTENDED FOR USE IN A PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND .' ' , #PV-011719-015866 <br /> LISTED FOR THE APPLICATION PER NEC 690.4(B). ,• �'► �� <br /> 10.ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. CONTRACTOR: <br /> 11.TERMINALS AND LUGS WILL BE TIGHTENED TO MANUFACTURER TORQUE SPECIFICATIONS(WHEN PROVIDED) .� <br /> IN ACCORDANCE WITH NEC CODE 110.14(D)ON ALL ELECTRICAL CONNECTIONS. ` 1 BRS FIELD OPS <br /> Sealed For 800-377-4480 <br /> EQUIPMENT LOCATIONS • <br /> �. Existing Roof& <br /> 1.PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT <br /> WILL BE PROVIDED AS PER SECTION NEC 110.26. Attachment Only <br /> 2.EQUIPMENT INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE AS i <br /> SPECIFIED BY NEC 690.31(A)AND NEC TABLE 310.15(B). 1 <br /> 3.ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO NEC 1/ ! U U <br /> APPLICABLE CODES. Z Q <br /> 4.ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE. <br /> PROJECT INFORMATION: ��. p �, 00 <br /> LO <br /> NUMBER OF STORIES: 1 ` Z. 0 LU LU <br /> CONDUIT RUN: Interior _ r j LL > - NN <br /> ECOBEE QTY: 1 � 44056 � � cin � � <br /> LIGHT BULB QTY: 18 <br /> PV METER: Not Required DESIGN CRITERIA SITE SPECIFICATIONS SHEET INDEX �Fcisr> �v �`�� w H H <br /> ROOF TYPE (1) INFORMATION: �SSlOHAt F..4%% O Y O U) N <br /> WIND SPEED: 110 mph CONSTRUCTION -V-B PV1 -COVER SHEET W LL "- N >- <br /> ROOF TYPE: Comp Shingle GROUND SNOW LOAD: 25 Ib/ft2 ZONING: RESIDENTIAL PV2-SITE PLAN N X Ln <br /> FRAMING TYPE: Manufactured Truss WIND EXPOSURE FACTOR: C PV3- ROOF PLAN N > V U <br /> SHEATHING TYPE: PLYWOOD V Q oo W Q <br /> SEISMIC DESIGN CATEGORY: D PV4-STRUCTURAL <br /> ATTACHMENT: SFM Infinity Switchblade Flashkit 1/18/2023 <br /> C <br /> RACKING: Unirac SFM Infinity @ 48" OC Portrait/72"OC Landscape PV5- ELECTRICAL LINE DIAGRAM <br /> NUMBER OF ATTACHMENTS: 46 SCOPE OF WORK PV6- ELECTRICAL CALCULATIONS DRAWING BY: <br /> PV7-WARNING LABELS AND LOCATIONS Tia Bradley <br /> ROOF TYPE (2) INFORMATION (IFAPPLICABLE): INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM AND ANY (ALL OTHER SHEETS AS REQUIRED) Digitally signed by <br /> *SEE PV4.2 NECESSARY ADDITIONAL WORK NEEDED FOR INSTALLATION. SS- PRODUCT SPEC. SHEETS PLOT DATE: <br /> John A. Calvert January 18, 2023 <br /> Date: 2023,01.18 <br /> SYSTEM TO BE INSTALLED INFORMATION: UTILITY COMPANY: 14:55:10 -07'00' NUMBER: <br /> PROJECT NUEMBER: <br /> DC SYSTEM SIZE: 7.9 kW DC Snohomish County Public Utilities District <br /> 86917 <br /> AC SYSTEM SIZE: 5.8 kW AC (PUD) SHEET NAME: <br /> MODULE TYPE: (20) QCells Q.PEAK DUO BILK ML-G10+ 395 COVER SHEET <br /> INVERTER TYPE: IQ8PLUS-72-2-US <br /> MONITORING: Enphase IQ Combiner 4 X-IQ-AM1-240-4 PERMIT ISSUER: REVISION: PAGE NUMBER: <br /> City of Everett 0 PV 1 <br />