My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8205 FLORIDA DR 2023-10-19
>
Address Records
>
FLORIDA DR
>
8205
>
8205 FLORIDA DR 2023-10-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 11:01:46 AM
Creation date
9/22/2023 6:39:03 AM
Metadata
Fields
Template:
Address Document
Street Name
FLORIDA DR
Street Number
8205
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2301-158 Description: Ek-7.9 kW PV Solar Panel Installation on Roof <br /> Applied: 1/20/2023 Approved: 1/23/2023 Site Address:8205 FLORIDA DR <br /> Issued: 1/24/2023 Finaled: 2/22/2023 City,State Zip Code: EVERETT,WA <br /> Status: FINALED Applicant: BRS FIELD OPS LLC(ELEC) <br /> Parent Permit: B2301-034 Owner:Alex Ek <br /> Parent Project: Contractor: BRS FIELD OPS LLC(ELEC) <br /> Details: <br /> INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SOLAR SYSTEM AND ANY NECESSARY ADDITIONAL WORK NEEDED FOR <br /> INSTALLATION. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 2/2/2023 2/2/2023 ELEC 10-FINAL STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/1/2023 3:21 PM BRS FIELD OPS LLC(ELEC) <br /> On-Site Contact is Jonathan Webster,(253)232-6456 <br /> Contact Name:BRS FIELD OPS LLC(ELEC) <br /> Site Address:8205 FLORIDA DR <br /> Phone:3852651237 <br /> e-Mail:permitting.department@blueravensolar.com <br /> Connect the array system mounted on the detached garage to the grounding electrode system of the detached garage per NEC 690.47(A). Provide a <br /> ladder for access to the attic to view wiring in the attic. <br /> 2/2/2023 2/2/2023 ELEC 02-GROUND STEVE BANKS APPROVAL <br /> WORK <br /> Notes: <br /> OK ditch between the two buildings. <br /> 2/14/2023 2/14/2023 ELEC 10-FINAL STEVE BANKS CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/13/2023 7:51 AM BRS FIELD OPS LLC(ELEC) <br /> Please call ahead,thank you! <br /> Contact Name:Jonathan Webster <br /> Site Address:8205 FLORIDA DR <br /> Phone:2532326456 <br /> e-Mail:inspection@blueravensolar.com <br /> Tie the 2 grounding electrode systems together on the garage and bury the grounding electrode conductor between rods 1 foot deep. <br /> I <br /> Printed:Wednesday, 22 February, 2023 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.