My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1502 100TH ST SW 2023-12-11
>
Address Records
>
100TH ST SW
>
1502
>
1502 100TH ST SW 2023-12-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 10:39:20 AM
Creation date
9/22/2023 11:25:15 AM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1502
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2201-059 Description: CONVERT SFR TO AFH <br /> Applied: 1/27/2022 Approved: 6/10/2022 Site Address: 1502 100TH ST SW <br /> Issued:7/18/2022 Finaled:8/10/2023 City,State Zip Code: EVERETT,WA 98204-2614 <br /> Status: FINALED Applicant:JOSE PEREZ <br /> Parent Permit: Owner: HIRRA BELETE BEZA&BIWETA SIMEGN M <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> CONVERT SFR TO AFH <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PERMIT EXTENSION EXTENSION <br /> 1/17/2023 1/17/2023 (REASON Unassigned APPROVED <br /> REQUIRED) <br /> Notes: <br /> JUST STARTED WORK <br /> BLDG 05- CORRECTION <br /> 1/18/2023 1/18/2023 UNDERFLOOR KURT KECK REQUIRED COVER FOR SUBFLOOR <br /> FRAMING <br /> Notes: <br /> 206-571-9533 <br /> WRNLELIII@GMAIL.COM <br /> 1.Provide approved plans on site for inspection2.Block floor system at bearing points3.Add hangers where needed <br /> BLDG 05- CORRECTION <br /> 1/19/2023 1/19/2023 UNDERFLOOR RAKEEB KHAN REQUIRED eTRAKiT Inspection Request <br /> FRAMING <br /> Notes: <br /> 1/18/2023 12:50 PM Belete Hirra <br /> Contact Name:Belete Hirra <br /> Site Address:1502 100TH ST SW <br /> Phone:2065719533 <br /> e-Mail:wrnlelill@gmail.com <br /> Do not cover kitchen floor.Need plumbing rough in for kitchen.Bedrooms are ok.Schedule re-inspection after plumbing rough in is approved.Add r-5 <br /> insulation at concrete stem wall per plan. <br /> obtain all sub permits. <br /> BLDG 05- <br /> 3/29/2023 3/29/2023 UNDERFLOOR RAKEEB KHAN APPROVAL <br /> FRAMING <br /> Notes: <br /> Plumbing approved <br /> I <br /> Printed: Friday, 22 September, 2023 1 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.