My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4634 ALGER AVE VERIZON WIRELESS ANTENNA 2023-12-06
>
Address Records
>
ALGER AVE
>
4634
>
VERIZON WIRELESS ANTENNA
>
4634 ALGER AVE VERIZON WIRELESS ANTENNA 2023-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 8:18:09 AM
Creation date
9/22/2023 11:41:14 AM
Metadata
Fields
Template:
Address Document
Street Name
ALGER AVE
Street Number
4634
Tenant Name
VERIZON WIRELESS ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® C O R E O N E CORE ONE CONSULTING US LTD. <br /> 506 Second Avenue,Suite 1512 <br /> U 5 A Seattle,Washington 93104 <br /> August 19,2021 <br /> Att: Pamela Turner <br /> Tilson Tech <br /> Verizon Project FEB 16 2023 {), <br /> Structural Opinion Letter <br /> CITY OF EVERETT <br /> Permit Services <br /> Site Name SEA Janbo <br /> Site Number 261276 <br /> Client Tilson <br /> Carrier Verizon <br /> 4634 Alger Ave <br /> Everett, WA 98203 <br /> Site Location 47.95511667° N NAD83 <br /> 122.2174806° W NAD83 <br /> Structure Type Assumed Class 1 Wood Pole <br /> Overall Result Contingent Pass <br /> Recommendation Contractor to verify utility pole class is a minimum Class 1 <br /> Dear Ms. Pamela, <br /> At the request of Tilson,CORE ONE CONSULTING USA has reviewed the existing structure using the provided site <br /> information.The installation of the antennas on the existing structure will be within compliance using the current building <br /> code.The existing structure does have sufficient capacity to support to resist the proposed loads.This evaluation is based <br /> on a review of the Construction Drawings(dated 07/16/2021)and photos(dated 06/24/2021) provided by Core One <br /> Consulting USA. <br /> This evaluation assumes that all existing structural members are in good condition, have not been altered from the <br /> manufacturer's original design, and have been installed per the manufacturer's requirements. Prior to installation of any <br /> new appurtenances,the contractor shall inspect the condition of all relevant members and connections and shall tighten all <br /> connections. The contractor is responsible for the means and methods of construction and shall notify Core One <br /> Consultants USA immediately if any field conditions differ from those listed above. <br /> Should you have any questions,comments or require additional information, please do not hesitate to call 1+(855)708-2195. <br /> Sincerely, ALA at <br /> Analysis performed by: Reviewed by: <br /> Fathullah Zamani _ r Michael Leeper,PE <br /> Structural Engineering Lead N 0 Senior Professional Engineer <br /> Core One Consulting USA • Core One Consulting USA <br /> 5, . u <br /> 'PFGfSTEF <br /> 4.4,67j.� N A 0�41 <br /> CORE:7`s <br />
The URL can be used to link to this page
Your browser does not support the video tag.