GENERAL NOTES: GENERAL NOTES CONT'D: GENERAL NOTES CONT'D: SPECIAL NOTES: <br /> 1. THE CONTRACTOR SHALL NOTIFY TOWER NETWORK CARRIER OF ANY ERRORS, 22. ALL EXISTING CONSTRUCTION, EQUIPMENT,AND FINISHES NOTED TO BE 48. CONTRACTOR TO DOCUMENT ALL CHANGES MADE IN THE FIELD BY MARKING 1. PLANS PART OF THIS SET ARE COMPLEMENTARY. INFORMATION IS NOT LIMITED TO ONE PLAN. <br /> OMISSIONS, OR INCONSISTENCIES AS THEY MAY BE DISCOVERED IN PLANS, REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND WILL BE UP (REDUNING)THE APPROVED CONSTRUCTION SET AND SUBMITTING THE DRAWINGS AND SPECIFICATIONS ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE PROPERTY OF • <br /> DOCUMENTS, NOTES, OR SPECIFICATIONS PRIOR TO STARTING CONSTRUCTION REMOVED FROM THE SITE WITH THE FOLLOWING EXCEPTIONS: _ ___ _ _REDLINED_ SET TO TOWER NETWORK CARRIER UPON COMPLETION. THE ARCHITECT, <br /> USEDEC, THE OWNER ON WHETHER <br /> PROJECT <br /> FOR <br /> PROJECTS T OR EXTENSION TOTHISPROJECT <br /> H MADEETER NOT. <br /> THE BY <br /> Y ARE J <br /> INCLUDING, BUT NOT UMITED BY, DEMOLITION. THE CONTRACTOR SHALL BE A. PROPERTY NOTED TO BE RETURNED TO THE OWNER. NOT TO Hve <br /> RESPONSIBLE FOR CORRECTING ANY ERROR, OMISSION, OR INCONSISTENCY B. PROPERTY NOTED TO BE REMOVED BY THE OWNER. 49. WITH POWER COMPANY AS REQUIRED. CONTRACTOR TO REPORT POWER AGREEMENT IN WRITING AND WITH APPROPRIATE COMPENSATION TO THE ARCHITECT. THESE PLANS WERE rIZO <br /> AFTER THE START OF CONSTRUCTION WHICH HAS NOT BEEN BROUGHT TO THE PREPARED TO BE SUBMITTED TO GOVERNMENTAL BUILDING AUTHORITIES FOR REVIEW FOR COMPLIANCE <br /> ATTENTION OF'TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER INSTALLATION COORDINATION SOLUTION(S)TO NETWORK CARRIER WITH APPLICABLE CODES AND IT IS THE SOLE RESPONSIBILITY OF THE OWNER AND/OR CONTRACTOR TO <br /> 23. <br /> AND SHALL INCUR ANY EXPENSES TO RECTIFY THE SITUATION. THE MEANS OF THE GOVERNING AGENCIES. CODE AUTHORITIES,AND BUILDING INSPECTORS REPRESENTATIVE, PROJECT CONSTRUCTION MANAGER AND ARCHITECT. BUILD ACCORDING TO APPLICABLE BUILDING CODES. <br /> CORRECTING ANY ERROR SHALL FIRST BE APPROVED BY TOWER NETWORK SHALL PROVIDE THE MINIMUM STANDARDS FOR CONSTRUCTION TECHNIQUES, <br /> CARRIER CONSTRUCTION PROJECT MANAGER. <br /> MATERIALS, AND FINISHES USED THROUGHOUT THE PROJECT. TRADE 50. ANY SUBSTITUTIONS OF MATERIALS AND/OR EQUIPMENT, MUST BE APPROVED 2. IF CONTRACTOR OR SUB-CONTRACTOR FIND IT NECESSARY TO DEVIATE FROM ORIGINAL APPROVED <br /> STANDARDS AND/OR PUBUSHED MANUFACTURERS SPECIFICATIONS MEETING OR BY TOWER NETWORK CARRIER CONSTRUCTION MANAGER. PLANS,THEN IT IS THE CONTRACTORS AND THE SUB-CONTRACTOR'S RESPONSIBIUTY TO PROVIDE THE <br /> 2. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS INVOLVED SHALL VISIT EXCEEDING DESIGN REQUIREMENTS SHALL BE USED FOR INSTALLATION. ARCHITECT WITH 4 COPIES OF THE PROPOSED CHANGES FOR HIS APPROVAL BEFORE PROCEEDING WITH <br /> THE JOB SITE TO FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING 51. THE GENERAL CONTRACTOR SHALL-BE-RESPONSIBLE FOR AND SHALL REMEDY THE WORK. IN ADDITION THE CONTRACTOR AND SUB-CONTRACTORS SHALL BE RESPONSIBLE FOR <br /> THE PROPOSED PROJECT. CONTRACTORS PRIOR TO THE COMMENCEMENT OF 24. WHEN REQUIRED STORAGE OF MATERIALS OCCURS,THEY SHALL BE EVENLY ALL FAULTY. INFERIOR,AND/OR IMPROPER MATERIALS, DAMAGED GOODS, PROCURING ALL NECESSARY APPROVALS FROM THE BUILDING AUTHORITIES FOR THE PROPOSED CHANGES <br /> CONSTRUCTION, THE CONTRACTOR HAVING BEEN AWARDED THIS PROJECT DISTRIBUTED OVER ROUGH FRAMED FLOORS OR ROOFS SO AS NOT TO AND/OR FAULTY WORKMANSHIP FOR ONE(1) YEAR AFTER THE PROJECT IS BEFORE PROCEEDING WITH THE WORK. THE CONTRACTOR AND SUB-CONTRACTORS SHALL BE <br /> SHALL VISIT THE CONSTRUCTION SITE WITH THE CONSTRUCTION/CONTRACT EXCEED THE DESIGNED LIVE LOADS FOR THE STRUCTURE. TEMPORARY COMPETE AND ACCEPTED UNDER THIS CONTRACT; UNLESS NOTED OTHERWISE RESPONSIBLE FOR PROCURING ALL NECESSARY INSPECTIONS AND APPROVALS FROM BUILDING <br /> WILLDOCU BENACCOMPLISHEDTS TO RIFY FAS SHOWN. <br /> IELD ITIOPRIOR TTONS AND CPROCEEDING WITHONFIRM THAT THE NOT <br /> NOTT ATTAINED/O THE DESIGN SHORING ANDR BRACING ISTRENGTTH FORS TO BE THE CONDITIONS PRESENT.IDED WHERE THE IN HAS IN THE CONTRACT BETWEEN THE OWNER AND THE CONTRACTOR. (EXCEPTION) AUTHORITIES DURING THE EXECUTION OF THE WORK. T I L S El N <br /> CONSTRUCTION,ANY ERRORS, OMISSIONS, OR DISCREPANCIES SHALL BE THE ROOFING SUBCONTRACTOR SHALL FURNISH A MAINTENANCE AGREEMENT 3. IN EVERY EVENT, THESE CONSTRUCTION DOCUMENTS AND SPECIFICATIONS SHALL BE INTERPRETED TO BE <br /> FOR ALL WORK DONE, COSIGNED BY THE GENERAL CONTRACTOR,TO MAINTAIN <br /> BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER VERBALLY AND IN 25. PRIOR TO THE POURING OF ANY NEW SLAB OVER AN EXISTING SLAB THE A MINIMUM ACCEPTABLE MEANS OF CONSTRUCTION BUT THIS SHALL NOT RELIEVE THE CONTRACTOR, <br /> WRITING. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL OPENINGS, CHASES, AND THE ROOFING IN A WATERTIGHT CONDITION FOR A PERIOD OF TWO (2)YEARS SUB-CONTRACTOR,AND/OR SUPPLIER/MANUFACTURER FROM PROVIDING A COMPLETE AND CORRECT JOB <br /> EQUIPMENT WHICH ARE TO BE IMPLEMENTED INTO THE NEW WORK. ALL STARTING AFTER THE DATE OF SUBSTANTIAL COMPLETION OF THE PROJECT, WHEN ADDITIONAL ITEMS ARE REQUIRED TO THE MINIMUM SPECIFICATION. IF ANY ITEMS NEED TO <br /> 3. FOR COLLOCATION SITES: CONTACT TOWER OWNER REPRESENTATIVE FOR ITEMS DESIGNATED TO BE ABANDONED SHALL BE NOTED AND DISCUSSED WITH UNLESS OTHERWISE WRITTEN IN THE CONTRACT BETWEEN THE OWNER AND EXCEED THESE MINIMUM SPECIFICATIONS TO PROVIDE A COMPLETE,ADEQUATE AND SAFE WORKING <br /> PARTICIPATION IN BID WALK. THE OWNER AND TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER THE CONTRACTOR. CONDITION, THEN IT SHALL BE THE DEEMED AND UNDERSTOOD TO BE INCLUDED IN THE DRAWINGS.AS PART OF THE AS-BUILT DRAWING PACKAGE. FOR EXAMPLE, IF AN ITEM AND/OR PIECE OF EQUIPMENT REQUIRES A LARGER WIRE SIZE(I.E. <br /> 4. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE PRECEDENCE, 52. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR THE SAFETY OF ELECTRICAL WIRE), STRONGER OR LARGER PIPING, QUAN <br /> TITY <br /> INCREASED (I.E. STRUCTURAL ELEMENTS), <br /> THIS SET OF DOCUMENTS IS INTENDED TO BE USED FOR DIAGRAMMATIC 26. SEAL ALL PENETRATIONS THROUGH FIRE-RATED AREAS WITH U.L. LISTED OR THE OWNER'S EMPLOYEES,WORKMEN,AND ALL TIMES DURING THE REDUCED SPACING,AND/OR INCREASED LENGTH (I.E. BOLTLENGTHS, BAR LENGTHS) THEN IT SHALL BE <br /> PURPOSES ONLY, UNLESS NOTED OTHERWISE.THE GENERAL CONTRACTOR'S FIRE MARSHALL APPROVED MATERIALS IF APPLICABLE TO THIS FACILITY AND CONSTRUCTION OF THE PROJECT. DEEMED AND UNDERSTOOD TO BE INCLUDED IN THE BID/PROPOSAL THESE DOCUMENTS ARE MEANT i� <br /> SCOPE OF WORK SHALL INCLUDE FURNISHING ALL MATERIALS, EQUIPMENT, OR PROJECT SITE. AS A GUIDE AND ALL ITEMS REASONABLY INFERRED SHALL BE DEEMED TO BE INCLUDED. '.O`. CORE O N E <br /> LABOR, AND ANY REQUIREMENTS DEEMED NECESSARY TO COMPLETE PROJECT 53. THE CONTRACTOR SHALL BE REQUIRED TO PAY FOR ALL NECESSARY PERMITS CONSULTING U S A <br /> AS DESCRIBED IN THE DRAWINGS AND OWNER'S PROJECT MANUAL. 27. BUILDING INSPECTORS AND/OR OTHER BUILDING OFFICIALS ARE TO BE AND/OR FEES WITH RESPECT TO THE WORK TO COMPLETE THE PROJECT. 4. THESE CONTRACT DOCUMENTS AND SPECIFICATIONS SHALL NOT BE CONSTRUED TO CREATE A <br /> NOTIFIED PRIOR TO ANY GRADING, CONSTRUCTION,AND ANY OTHER PROJECT BUILDING PERMIT APPLICATIONS SHALL BE FILED BY THE OWNER OR HIS CONTRACTUAL RELATIONSHIP OF ANY KIND BETWEEN THE ARCHITECT AND THE CONTRACTOR. 506 SECOND AVE, SUITE 1533 <br /> 5. THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT TO SET FORTH IN EFFORT AS MANDATED BY THE GOVERNING AGENCY. REPRESENTATIVE. CONTRACTOR SHALL OBTAIN PERMIT AND MAKE FINAL SEATTLE, WA 98104 <br /> THE CONSTRUCTION AND CONTRACT DOCUMENTS THE COMPLETE SCOPE OF PAYMENT FOR SAID DOCUMENT. <br /> WORK. CONTRACTORS BIDDING THE JOB ARE NEVERTHELESS CAUTIONED THAT 28. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF <br /> MINOR OMISSIONS OR ERRORS IN THE DRAWINGS AND OR SPECIFICATIONS NOT LESS THAN 2-A OR 2-A1OBC WITHIN 75 FEET TRAVEL DISTANCE TO ALL 54. THE ARCHITECT/ENGINEER IN CHARGE SHALL SIGN AND SEAL ALL DRAWINGS <br /> SHALL NOT EXCUSE SAID CONTRACTOR FROM COMPLETING THE PROJECT AND PORTIONS OF PROJECT AREA DURING CONSTRUCTION. AND/OR SPECIFICATIONS. <br /> IMPROVEMENTS IN ACCORDANCE WITH THE INTENT OF THESE DOCUMENTS.THE <br /> BIDDER SHALL BEAR THE RESPONSIBILITY OF NOTIFYING (IN WRITING)THE 29. THE PROJECT, WHEN COMPLETED, SHALL COMPLY WITH LOCAL SECURITY 55. TOWER NETWORK CARRIER WILL REVIEW AND APPROVE SHOP DRAWINGS AND <br /> ARCHITECT/ENGINEER OF ANY CONFLICTS, ERRORS, OR OMISSIONS PRIOR TO CODES AND TITLE-24 ENERGY CONSERVATION REQUIREMENTS. (TITLE-24 SAMPLES FOR CONFORMANCE WIH DESIGN CONCEPT. TOWER NETWORK PROJECT NO: 21 30U0098 <br /> SUBMISSION OF CONTRACTOR'S PROPOSAL. IN THE EVENT OF DISCREPANCIES WHEN APPLICABLE) CARRIER PROJECT APPROVAL OF A SEPARATE ITEM SHALL NOT INCLUDE <br /> THE CONTRACTOR SHALL PRICE THE MORE COSTLY OR EXTENSIVE WORK, APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS. <br /> UNLESS DIRECTED OTHERWISE. DRAWN BY: I.E. <br /> 30. ALL GLASS AND GLAZING IS TO COMPLY WITH CHAPTER 54 OF THE U.S. 56, ALL ANTENNAS ON ROOF SUPPORT FRAMES TO BE PROVIDED BY <br /> 6. DRAWINGS ARE NOT TO BE SCALED UNDER ANY CIRCUMSTANCE.TOWER CONSUMER SAFETY COMMISSION - SAFETY STANDARDS FOR ARCHITECTURAL TOWERL NETWORK MOUNTEDDR NOROOFICATIPOR <br /> ONS. <br /> NETWORK CARRIER IS NOT RESPONSIBLE FOR ANY ERRORS RESULTING FROM GLAZING MATERIALS (42 FR 1428, CFR PART 1201)AND LOCAL SECURITY <br /> THIS PRACTICE WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALE SHOWN REQUIREMENTS. CHECKED BY: L.C. <br /> ON PLANS. 57. CONTRACTOR TO PROVIDE TRENCH AS REQUIRED TO INSTALL BOTH ELECTRICAL <br /> 31. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING AND TELEPHONE UNDERGROUND CONDUITS (#40 PVC) PER S.C.E. <br /> 7. OWNER, CONTRACTOR,AND TOWER NETWORK CARRIER CONSTRUCTION PROJECT IMPROVEMENTS, EASEMENTS, PAVING, CURBING, ETC. DURING CONSTRUCTION. WORKORDER. BACKFILL WITH CLEAN SAND AND COMPACT TO THE SUBMITTALS <br /> MANAGER SHALL MEET JOINTLY TO VERIFY ALL DRAWINGS AND SPECIFICATIONS UPON COMPLETION OF WORK, CONTRACTOR SHALL REPAIR ANY DAMAGE THAT SATISFACTION OF THE DISTRICTS INSPECTOR. REPLACE FINISH GRADE WITH <br /> PRIOR TO THE START OF CONSTRUCTION. MAY HAVE OCCURRED DUE TO CONSTRUCTION ON OR ABOUT THE PROPERTY. MATCHING MATERIALS (GRASS,ASPHALT, CONCRETE, ETC.) <br /> 8. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO 32. CONTRACTOR SHALL KEEP GENERAL WORK AREA CLEAN AND HAZARD FREE 58. CONTRACTOR TO PROVIDE HEAVY STEEL PLATES AT OPEN TRENCHES FOR <br /> PROCEED WITH CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT DURING CONSTRUCTION AND DISPOSE OF ALL DIRT, DEBRIS,AND RUBBISH. SAFETY AND TO PROTECT EXISTING GROUND SURFACES FROM HEAP <br /> CLEARLY DEFINED BY THE CONSTRUCTION DRAWINGS/CONTRACT DOCUMENTS. CONTRACTOR SHALL REMOVE EQUIPMENT NOT SPECIFIED AS REMAINING ON EQUIPMENT UTIUZED DURING CONSTRUCTION. <br /> THE PROPERTY OR PREMISES. SEE SHALL BE LEFT IN CLEAN CONDITION <br /> 9. THE CONTRACTOR SHALL PERFORM WORK DURING OWNER'S PREFERRED AND FREE FROM PAINT SPOTS, DUST, OR SMUDGES OF ANY NATURE. 59. CONTRACTOR TO PATCH AND REPAIR ALL GROUND SURFACES WITHIN THE <br /> HOURS TO AVOID DISTURBING NORMAL BUSINESS. CONSTRUCTION AREA AS NECESSARY TO PROVIDE A UNIFORM SURFACE AND <br /> 10. THE CONTRACTOR SHALL PROVIDE TOWER NETWORK CARRIER PROPER 33. NEW CONSTRUCTION ADDED TO EXISTING CONSTRUCTION SHALL MATCH IN MAINTAIN EXISTING SURFACE DRAINAGE SLOPES. <br /> INSURANCE CERTIFICATESO NAMING TOWER NETWORK AS ADDITIONAL FORM, TEXTURE, FINISH,AND IN MATERIALS EXCEPT AS NOTED IN THE PLANS <br /> INSURED,A AND TOWER NETWORK CARRIER PROOF OF CARRIERE UCENSE(S)AND PE AND SPECIFICATIONS. 60. CONTRACTOR TO REPLACE LANDSCAPE VEGETATION THAT WAS DAMAGED DUE <br /> INSURANCE. () TO CONSTRUCTION,AND TO MODIFY REMAINING IRRIGATION LINES TO <br /> P34. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BACKING, BLOCKING, OPERATING CONDITION. PROVIDING FULL COVERAGE TO IMPACTED AREAS. <br /> 11. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN AND/OR SLEEVES REQUIRED FOR THE INSTALLATION OF FIXTURES, <br /> MECHANICAL EQUIPMENT, PLUMBING, HARDWARE,AND FINISH ITEMS TO 61. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA <br /> RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS,TECHNIQUES, <br /> THE CONTRACT DOCUMENTS.THE CONTRACTOR SHALL BE SOLELY ENSURE A PROPER AND COMPLETE JOB. FRAMES WHERE PENETRATION OF EXISTING ROOFING MATERIALS OCCUR,THE <br /> SEQUENCES,AND PROCEDURES FOR COORDINATING ALL PORTIONS OF THE GENERAL CONTRACTOR SHALL COORDINATE WITH BUILDING OWNER AND 0 JUL 16/21 FINAL c0's WI <br /> WORK UNDER THE CONTRACT. 35. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A PROJECT LEVEL, BUILDING ROOFING CONTRACTOR OF RECORD FOR INSTALLATION, PATCH, <br /> STRAIGHT,AND TRUE ACCORDING TO THE PLANS. THE CONTRACTOR SHALL REPAIR OR ANY AUGMENTATION TO THE ROOF,AND HAVE THE WORK B JUN 29/21 REVISED PER COMMENTS SR <br /> 12. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING COMPARE THE LINES AND LEVELS OF THE EXISTING CONDITIONS WITH THOSE GUARANTEED UNDER THE ROOFING CONTRACTOR'S WARRANTY FOR MOISTURE A JUN 10/21 ISSUED FOR 90X CD's IE <br /> TO MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE SHOWN ON THE PLANS PRIOR TO THE START OF ANY CONSTRUCTION.TOWER PENETRATION OR AND OTHER FUTURE BREACH OF ROOFING INTEGRITY. <br /> OR WHERE LOCAL CODES OR ORDINANCES TAKE PRECEDENCE. NETWORK CARRIER SHALL BE NOTIFIED OF ANY ERRORS, OMISSIONS, OR THE INFORMATION CONTAINED IN THIS SET OF <br /> INCONSISTENCIES PRIOR TO ANY CONSTRUCTION. 62. IN THE CASE OF ROOFTOP SOLUTIONS WITH THE INSTALLATION OF ANTENNAS oCCUMENTS IS PROPRIETARY SY NATURE <br /> 13. ALL WORK PERFORMED ON THE PROJECT AND MATERIALS INSTALLED SHALL WITHIN CONCEALED (SHROUDED) SUPPORT FRAMES OR TRIPODS,THE GENERAL ANY USE CR DISCLOSURE OTHER THAN THAT <br /> BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, REGULATIONS,AND 36. THE CONTRACTOR IS TO PROVIDE PROTECTION FOR ADJOINING PROPERTIES CONTRACTOR SHALL COORDINATE WITH THE FRP DESIGNER/FABRICATOR TO ICRYPTESBI THE CLIENT NAMED IS <br /> ORDINANCES. CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL FROM PHYSICAL HARM, NOISE, DUST, DIRT, AND FIRE AS REQUIRED BY THE ENSURE THAT THE FINAL FRP SHROUD IS SIMULATING (IN APPEARANCE) <br /> LAWS, ORDINANCES, RULES, REGULATIONS AND LAWFUL ORDERS OF ANY GOVERNING AGENCIES. DESIGNATED EXISTING EXTERIOR BUILDING FACADE MATERIALS,TEXTURES,AND `- 1 <br /> PUBLIC AUTHORITY, MUNICIPAL AND UTIUTY COMPANY SPECIFICATIONS,AND COLORS. THE CONTRACTOR SHALL FURTHERMORE ENSURE THE USE OF .sE l LOCAL AND STATE JURISDICTIONAL CODES BEARING ON THE PERFORMANCE OF 37. WHERE SPECIFIED, MATERIALS TESTING SHALL BE TO THE LATEST STANDARDS COUNTERSUNK FASTENERS IN ALL FRP CONSTRUCTION. WHEN [�. <br /> THE WORK. AND/OR REVISIONS AVAILABLE AS REQUIRED BY THE GOVERNING AGENCY PHOTOSIMULATIONS ARE PROVIDED,HE CONTRACTOR SHALL ENSURE THAT 1Ar G <br /> RESPONSIBLE FOR RECORDING THE RESULTS. FINAL CONSTRUCTION REPRESENTS WHAT IS INDICATED IN PHOTOSIMULATION. O rr- ' <br /> 14. GENERAL CONTRACTOR SHALL PROVIDE, AT THE PROJECT SITE, A FULL SET SHOP DRAWINGS SHALL BE PROVIDED TO THE GENERAL CONTRACTOR, ` <br /> OF CONSTRUCTION DOCUMENTS UPDATED WITH THE LATEST REVISIONS AND CONSTRUCTION COORDINATOR, AND ARCHITECT PRIOR TO FABRICATION AND <br /> ADDENDA OR CLARIFICATIONS FOR USE BY ALL PERSONNEL INVOLVED WITH 38. HE CONTRACTOR IS RESPONSIBLE FOR THE STORAGE OF ALL MATERIALS AND CONSTRUCTION. <br /> THE PROJECT. THIS SET IS A VALID CONTRACT DOCUMENT ONLY IF THE SHALL NOT DO SO ON PUBLIC PROPERTY WITHOUT A PERMIT TO DO SO <br /> FROM THE GOVERNING AGENCIES FOR THIS PURPOSE. (� <br /> TITLE SHEET IS STAMPED "FOR CONSTRUCTION"AND EACH SUCCESSIVE SHEET � Z <br /> BEARS THE ARCHITECT'S SIGNED WET STAMP. 63. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA <br /> 39. GENERAL NOTES AND STANDARD DETAILS ARE THE MINIMUM REQUIREMENTS TO FRAMES WHERE ANCHORING TO A CONCRETE ROOF SLAB IS REQUIRED, <br /> 15. A COPY OF GOVERNING AGENCY APPROVED PLANS SHALL BE KEPT IN A BE USED IN CONDITIONS WHICH ARE NOT SPECIFICALLY SHOWN OTHERWISE. CONTRACTORS SHALL CONFIRM (PRIOR TO SUBMITTING BID) WITH CONSULTING ep <br /> PLACE SPECIFIED BY THE GOVERNING AGENCY,AND BY LAW, SHALL BE CONSTRUCTION COORDINATOR AND ARCHITECT THE PRESENCE OF POST 8,/ <br /> AVAILABLE FOR INSPECTION AT ALL TIMES. THE PLANS ARE NOT TO BE USED 40. TRADES INVOLVED IN THE PROJECT SHALL BE RESPONSIBLE FOR THEIR OWN TENSION TENDONS WITHIN THE ROOF SLAB - RESULTING FROM AN .-0 <br /> )" . <br /> BY THE WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT THE SAME CUTTING, FITTING, PATCHING, ETC., SO AS TO BE RECEIVED PROPERLY BY THE UNDOCUMENTED DESIGN CHANGE IN THE EXISTING BUILDING "AS-BUILT 56058 4f <br /> INFORMATION AS GOVERNING AGENCY APPROVED PLANS, THE CONTRACTOR WORK OF OTHER TRADES. DRAWING SET" - HAVING INDICATED AN ORIGINAL DESIGN SOLUTION OF <br /> SHALL ALSO MAINTAIN ONE SET OF PLANS, IN GOOD CONDITION, COMPLETE REINFORCED CONCRETE W/ EMBEDDED STEEL REBAR. IN THE EVENT POST (��N/PFG/ST .•C* i�`� <br /> WITH ALL REVISIONS, ADDENDA,AND CHANGE ORDERS ON THE PREMISES AT 41. ALL DEBRIS AND REFUSE IS TO BE REMOVED FROM THE PROJECT PREMISES TENSION SLAB SOLUTION IS PRESENT, CONTRACTOR SHALL INCLUDE ('�(�^���� ,,,\ . <br /> ALL TIMES UNDER THE DIRECT CARE OF THE SUPERINTENDENT. THE AND SHALL BE LEFT IN A CLEAN (BROOM FINISH) CONDITION AT ALL TIMES PROVISIONS FOR X-RAY PROCEDURES (INCLUDED IN BID) FOR ALL J J- \+ <br /> CONTRACTOR SHALL SUPPLY TOWER NETWORK CARRIER CONSTRUCTION BY EACH TRADE AS THEY PERFORM THEIR OWN PORTION OF THE WORK. PENETRATION AREAS WHERE ANCHORING OCCURS. _s__T <br /> PROJECT MANAGER. WITH A COPY OF ALL REVISIONS, ADDENDA,AND/OR <br /> CHANGE ORDERS AT THE CONCLUSION OF THE WORK AS A PART OF THE 42. TOWER NETWORK CARRIER DOES NOT GUARANTEE ANY PRODUCTS, FIXTURES, 64. GENERAL&SUB CONTRACTORS SHALL USE STAINLESS STEEL METAL LOCKING <br /> AS-BUILT DRAWING RECORDS. AND/OR ANY EQUIPMENT NAMED BY A TRADE OR MANUFACTURER. GUARANTEE TIES FOR ALL CABLE TRAY TIE DOWNS AND ALL OTHER GENERAL TIE DOWNS <br /> 16. THE OF ADJACENT CONSTRUCTION OR FACILITIES OR WARRANTY THAT MAY BE IN EFFECT IS DONE SO THROUGH THE COMPANY (WHERE APPUCABLE). PLASTIC ZIP TIES SHALL NOT BE PERMITTED FOR USE <br /> ARE NOT TO STRUCTURALBE ALTERED COMPONENTSY THIS CONSTRUCTIONJACENTCOPROJECT UNLESS NOTEDS OR MANUFACTURER PROVIDING THE PRODUCT, FIXTURE, AND/OR EQUIPMENT ON TOWER NETWORK CARRIER PROJECTS. RECOMMENDED MANUFACTURE SHALL SEA JANBO <br /> OTHERWISE. ONLY: UNLESS SPECIFIC RESPONSIBILITY IS ALSO PROVIDED BY THE BE: PANDUIT CORP. METAL LOCKING TIES MODEL NO. MLT4S-CP UNDER <br /> CONTRACTOR/SUBCONTRACTOR IN WRITTEN FORM. SERIES-304 (OR EQUAL).PANDUIT PRODUCT DISTRIBUTED BY TRIARC. 4634 ALDER AVE <br /> 17. THE CONTRACTOR SHALL STUDY THE STRUCTURAL, ELECTRICAL MECHANICAL, EVERETT,WA 98203 <br /> AND PLUMBING PLANS AND CROSS CHECK THEIR DETAILS, NOTES, 43. CAUTION! CALL BEFORE YOU DIG! BURIED UTIUTIES EXIST IN THE AREA AND 65. ALL WORK TO BE DONE BETWEEN HOURS OF 8:00 AM AND 5:00 PM, <br /> DIMENSIONS,AND ALL REQUIREMENTS PRIOR TO THE START OF ANY WORK. UTILITY INFORMATION SHOWN MAY NOT BE COMPLETE. CONTACT THE EXCLUDING HOLIDAYS <br /> ONE-CALL UTILITY LOCATE SERVICE A MINIMUM OF 48 HOURS PRIOR TO <br /> 18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF CONSTRUCTION. 1-800-424-5555. <br /> THE PROJECT AND SITE WHILE THE WORK IS IN PROGRESS UNTIL THE JOB IS <br /> COMPLETE. 44. CONTRACTOR TO REPLACE AND/OR REROUTE ANY EXISTING UNDERGROUND <br /> 19. THE CONTRACTOR HAS THE RESPONSIBILITY OF LOCATING ALL EXISTING UTILITIES ENCOUNTERED DURING TRENCHING AND GENERAL CONSTRUCTION. SHEET TITLE <br /> UTILITIES WHETHER OR NOT SHOWN ON THE PLANS,AND TO PROTECT THEM 45. CONTRACTOR TO LOCATE ALL UTILITIES PRIOR TO PLACEMENT OF MONOPOLE <br /> FROM DAMAGE. THE CONTRACTOR, OR SUBCONTRACTOR AS SPECIFIED IN THE FOOTING AND OTHER STRUCTURES TO BE PLACED IN GROUND. SEE GENERAL <br /> AGREEMENT BETWEEN SUBCONTRACTOR AND CONTRACTOR, SHALL BEAR THE NOTE#6 ON THIS SHEET. GENERAL NOTES <br /> EXPENSES OF REPAIR AND/OR REPLACEMENT OF UTIUTIES OR OTHER <br /> PROPERTY DAMAGE BY OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE WORK. 46. SEE CIVIL DRAWINGS FOR ADDITIONAL SITE INFORMATION. <br /> 20. THE REFERENCES ON THE DRAWINGS ARE FOR CONVENIENCE ONLY AND 47. CONTRACTOR TO DOCUMENT ALL WORK PERFORMED WITH PHOTOGRAPHS AND SHEEr NUMBER <br /> SHALL NOT UMIT THE APPLICATION OF ANY DRAWING OR DETAIL SUBMIT TO TOWER NETWORK CARRIER ALONG WITH REDLINED CONSTRUCTION <br /> SET. GN- 1 <br /> 21. ALL DIMENSIONS ON THE PLANS ARE TO FACE OF STUD (F.O.S.) UNLESS <br /> NOTED OTHERWISE (U.N.O.). <br />