My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1626 BAKER AVE 2023-12-06
>
Address Records
>
BAKER AVE
>
1626
>
1626 BAKER AVE 2023-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 8:57:13 AM
Creation date
9/22/2023 11:46:12 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
1626
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/7/2021 12/7/2021 BLDG 08-FRAMING KURT KECK NOT READY site visit see notes <br /> Notes: <br /> 12/6/2021 12:32 PM Catharina Teunisse <br /> inspection of removed interior wall and new interior wall frame <br /> Contact Name:Catharina Teunisse <br /> Site Address:1626 BAKER AVE <br /> Phone:4252454748 <br /> e-Mail:teunisse@comcast.net <br /> (12/7/2021 9:48 AM KMK) <br /> KMK changed Inspection Type from BLDG 15-OTHER to BLDG 08-FRAMING <br /> (12/7/2021 9:51 AM KMK) <br /> 1.Obtain electrical permit and rough in inspection. <br /> 2.Schedule for plumbing rough in inspection <br /> Recall for framing inspection when above is complete <br /> 1/18/2022 1/18/2022 BLDG 08-FRAMING KURT KECK APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 1/14/2022 12:07 PM Catharina Teunisse <br /> Contact Name:Catharina Teunisse <br /> Site Address:1626 BAKER AVE <br /> Phone:4252454748 <br /> e-Mail:teunisse@comcast.net <br /> 6/3/2022 6/3/2022 BLDG 16-FINAL KURT KECK NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 6/2/2022 10:12 AM Catharina Teunisse <br /> Contact Name:Catharina Teunisse <br /> Site Address:1626 BAKER AVE <br /> Phone:4252454748 <br /> e-Mail:teunisse@comcast.net <br /> (6/3/2022 1:31 PM KMK) <br /> 1.Obtain finals on all sub permits to include plumbing and electrical <br /> 2.Reschedule building final when ready <br /> Printed: Friday, 22 September,2023 2 of 3 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.