|
1 2 3 4 5
<br /> NEW PIPE TO PIPE CLAMP
<br /> NEW STANDOFF TO © TO BE INSTALLED
<br /> EXISTING RRH TO REMAIN BE INSTALLED SITEPROI SCP1OW P2D0 EXISTING RRH TO REMAIN
<br /> COMMSCOPE P200 (4 TOTAL,2 PER
<br /> ALU B66A RRH4X45-4R (1 PER POSITION C4) POSITIONS C3&C4) ALU 866A RRH4X45-4R
<br /> `�. (3 TOTAL,1 PER SECTOR) `. (3 TOTAL,1 PER SECTOR) P D GROUP
<br /> C4 Professional Corporation
<br /> EXISTING OVP TO BE REMOVED 5205outh Main Street,Suite 2531
<br /> i / Akron,OH 44311
<br /> RAYCAP DC2-48-60-0-9E 1��, 330.572.2100 Fox 330.572.2101
<br /> (3 TOTAL,1 PER SECTOR)
<br /> EXISTING RRH TO BE REMOVED C4
<br /> NOKIA 4T4R B14 160W FRBI 7. •• - 111 - mmen
<br /> (3 TOTAL,1 PER SECTOR) i • Ii.
<br /> •
<br /> atslt
<br /> •,", \ 7, I �� Mobility
<br /> NEW STANDOFF TO 0
<br /> C C3 EXISTING OVP TO REMAIN BE INSTALLED © 19801-SW-72ND AVENUE,STE.200
<br /> DC2-08.60-0-9E COMMSCOPE P100 TUALATIN,OR 97062
<br /> (6 TOTAL,2 PER SECTOR) (1 PER POSITION C3)
<br /> GAMMA -�'
<br /> 245• I EXISTING OVP TO BE REMOVED
<br /> I' RAYCAP FC12-PC6-10E �•
<br /> :1TTOOTTAA: ���XISTINOVP TO REMAINC3IPIEXISTING OVP TO REMAIN r:�H as TecC2 . 1�1 IAYCAPCI2-PC6-10E GAMMA 1p ___ RAYCAP FC72-PC6-10E 2ND AV RUE.STEMS�. 245° (2 TOTAL)
<br /> - '� 22263 68TH AVENUE SOUTH
<br /> KENT.WA 98032
<br /> _ !•�•_•�•'_- EXISTING RRH TO REMAIN _ :WI �e� Al EXISTING RRH TO REMAIN
<br /> ALU B25 RRH4X30-4R ALU B25,1 PER 0-0R
<br /> _ (3 TOTAL,1 PER SECTOR) Mil (3 TOTAL,1 PER SECTOR)
<br /> Al EXISTING RRH TO BE REMOVED Al E
<br /> co
<br /> z
<br /> ' ALU RRH2X40W_7L ` z
<br /> \ � (3 TOTAL,1 PER SECTOR) i
<br /> C �+� O i
<br /> 66
<br /> lit ••g ✓ \��t •�•� F- w z
<br /> Cl �`
<br /> Cl (N)AT&T RAYCAP DC6-08-60-18 OVP 0 EXISTING RELOCATED RRH pi' w O
<br /> MOUNTED TO18 FRAME OVP ® V. NOKIA 4T4R BS 160W AHCA U H
<br /> (3 TOTAL,1 PER SECTOR) (3 TOTAL,1 PER SECTOR) CO If,
<br /> •` ` ALPHA KO 0
<br /> A2 '` 45° o U
<br /> w
<br /> S� ALPHA �� ` N u.
<br /> *. 45• II
<br /> EXISTING RRH RELOCATED �� A3
<br /> ALU RRH4X25-WCS-0R ~
<br /> (3 TOTAL,1 PER SECTOR) / .., O $' o
<br /> Alt�� w a 0
<br /> 2 li,
<br /> 7e
<br /> NEW RHN TO BE INSTALLED © ce
<br /> Irli_Elel,/17# . 7� NOKIA 4T4R B12/14/29 370W AHLBBA W • sC ,
<br /> g , '-/ (3 TOTAL,1 PER SECTOR) .• -N
<br /> a
<br /> A4 .71%,
<br /> 6 k4 ° '
<br /> A4NAL
<br /> m*r3;m%'7--
<br /> s 06 :�1/2022
<br /> co to tn
<br /> \ / / EXISTING RRH TO BE RELOCATED N O Z
<br /> ALU RRH4X25-WCS-0R
<br /> 00/\,..
<br /> iff
<br /> (3 TOTAL,1 PER SECTOR) 4/ CC N O Q
<br /> ANTENNAS,RRHs AND SQUIDSco
<br /> a1 Ce a
<br /> TO BE>3'SEPARATION FROM T Z Q LPL
<br /> A AEQK(CBAND)ANTENNAS(TYP.) y y a
<br /> F" U Z
<br /> \ I EXISTING RRH TO BE RELOCATED
<br /> NOKIA 4T4R B5160W AHCA {� I-
<br /> (3TOTAL,1 PER SECTOR) ` EXISTING ANTENNA TO BE RELOCATED r N W '^ Z
<br /> KATHREIN 80010991 W Q W V LLI
<br /> �� i�' •% (3 TOTAL,1 PER SECTOR) W W Z F...
<br /> , � �. r > N H—
<br /> Z
<br /> ♦ \B1 V ♦ ', LV CO Q
<br /> X
<br /> \ • O W
<br /> GENERAL NOTES: ISSUED FOR:
<br /> B2 EXISTING ANTENNA TO BE REMOVED REVIEW 09/30/21
<br /> KATHREIN 80010865 1.CONTRACTOR SHALL FIELD VERIFY MOUNTING OF •
<br /> ', (6 TOTAL,2 PER SECTOR) EXISTING&PROPOSED EQUIPMENT MEETS AT&T MINIMUM ' �4 PERMIT -
<br /> SPACING REQUIREMENTS AS DESCRIBED IN AT&T ANTENNA
<br /> Fir
<br /> A C EXISTING TMAs TO BE REMOVED COLLOCATION GUIDELINES(ATT-002-290-105),GENERALLY BETA
<br /> 35{ CONSTRUCTION -
<br /> • ��,„ BETA ANDREW LGP21401 SUMMARIZED BY: 0 ooz\d/ 63 1RECORD/�' 135° (6 TOTAL,2 PER SECTOR) -
<br /> -3'-0•MINIMUM DISTANCE REQUIRED BETWEEN LTE
<br /> EXISTING ANTENNA TO BE REMOVED ANTENNAS ON SAME SECTOR. © NEW ANTENNA TO BE INSTALLED
<br /> g3 CELLMAX CMA-UBTMLBMLBHH-6516-16-21-21
<br /> EXIS IN N NTENN PROJECT MANAGER DESIGNER
<br /> (3 TOTAL,1 PER SECTOR) -6'-0"MINIMUM DISTANCE REQUIRED BETWEEN 700BC& (3 TOTAL,1 PER SECTOR)
<br /> 700DE ANTENNAS ON SAME SECTOR. CB CT
<br /> EXISTING ANTENNA TO BE RELOCATED 4'-0"MINIMUM DISTANCE REQUIRED BETWEEN LTE 700
<br /> �tKATHREIN 80010991 ANTENNAS ON OPPOSING SECTORS. �� _ NEW ANTENNA TO BE INSTALLED GPO JOB NO.
<br /> 19 (3 TOTAL,1 PER SECTOR) NOKIA AEQK
<br /> -3'-0"MINIMUM DISTANCE REQUIRED BETWEEN 5G ir (3 TOTAL,1 PER SECTOR) 2021723.06.45587.01
<br /> B4 CBAND ANTENNAS AND OTHER TECHNOLOGIES.
<br /> ,,nlll\ B4 /III\
<br /> O EXISTING ANTENNA PLAN F, 2.CONSTRUCTION MANAGER/GENERAL CONTRACTOR O PROPOSED ANTENNA PLAN �,
<br /> SHALL REVIEW PRIOR
<br /> THE TMOUNTI ANALYSIS FOR ANY
<br /> CONDITIONS PRIOR TO INSTALLATION. o
<br /> SCALE: N.T.S. p SCALE: N.T.S. p \ C_5
<br /> Z 3.ANY REQUIRED MOUNT MODIFICATIONS DESIGN OR Z
<br /> MOUNT REPLACEMENT SHALL BE APPROVED BY EOR.
<br /> 4. l
<br />
|