My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
209 E CASINO RD A T AND T MOBILITY ANTENNAS 2023-09-25
>
Address Records
>
E CASINO RD
>
209
>
A T AND T MOBILITY ANTENNAS
>
209 E CASINO RD A T AND T MOBILITY ANTENNAS 2023-09-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2023 2:00:08 PM
Creation date
9/25/2023 1:59:02 PM
Metadata
Fields
Template:
Address Document
Street Name
E CASINO RD
Street Number
209
Tenant Name
A T AND T MOBILITY ANTENNAS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 2 3 4 5 <br /> GROUNDING PLAN LEGEND: <br /> ---EXISTING GROUND WIRE <br /> (l COPPER II <br /> --NEW GROUND WIRE . GROUND ROD � � <br /> • EXOTHERMIC WELD /... D <br /> GROUND ROD ,��', Professional Corporation <br /> • MECHANICAL CONNECTION W/TEST WELL <br /> Akron520 South Main Street,Suite 2531 <br /> 11 <br /> C4 _ — Fox 33 OH.2101 <br /> `` _.---- 550.522.2100 Fox 330.SR.2101 <br /> GENERAL NOTES: LR ;- _ <br /> 1. CONTRACTOR SHALL HAVE A COMPLETE \ I.I NEW#2 AWG GROUND LEAD FROM <br /> UNDERSTANDING OF THE CONTENTS OF AT&T NEW OR RELOCATED RRHs • tsct <br /> STANDARD TP-76416. \ TO EXISTING SECTOR GROUND ,\```'d//,Q <br /> 2. ALL GROUNDING CONDUCTORS SHALL PROVIDE A I / BAR(TYP.) <br /> STRAIGHT DOWNWARD PATH TO GROUND WITH GAMMA I -SEE DETAIL 3 ON SHEET G-2 Mobility <br /> GRADUAL BEND AS REQUIRED.GROUND WIRES SHALL MECHANICAL LUG CONNECTION(TYP.) 245° II / �� <br /> NOT BE LOOPED OR SHARPLY BENT. -SEE DETAIL 6 ON SHEET G-2 / / NEW#2 AWG GROUND LEAD FROM <br /> C 3. KOPRSHIELD ANTI-OXIDATION COMPOUND SHALL BE / SW 72ND AVENUE,ST <br /> USED ON ALL COMPRESSION GROUNDING 7-. VII NEW OVPS 70 EXISTING GROUND BAR 980 TUALATIN,OR 97062 E.200 <br /> CONNECTIONS. ese -SEE DETAIL 3 ON SHEET G-2 <br /> 4. ALL EXOTHERMIC CONNECTIONS SHALL BE INSTALLED - <br /> UTILIZING THE PROPER CONNECTION/MOLD AND N <br /> MATERIALS FOR THE PARTICULAR APPLICATION. 11-1: <br /> �5. ALL BOLTED GROUNDING CONNECTIONS SHALL BE C3 <br /> INSTALLED WITH AN EXTERNAL TOOTHED LOCK �\ 1WASHER.GROUNDING BUS BARS MAY HAVE • <br /> �M a sTe c <br /> PRE-PUNCHED HOE E <br /> S OR TAPPED HOS.ALLHARDWARE SHALL BE SECURITY TORQUE HARDWARE INetwork Solutions <br /> 3/8"STAINLESS STEEL. I <br /> ill <br /> 6. EXTERNAL GROUNDING CONDUCTOR SHALL NOT BE - 22263 68TH AVENUE SOUTH <br /> INSTALLED OR ROUTED THROUGH HOLES IN ANY -— KENT,WA 98032 <br /> METAL OBJECTS,CONDUITS,OR SUPPORTS TO —.11 . <br /> PRECLUDE ESTABLISHING A MAGNETIC CHOKE POINT. EM <br /> 7. PLASTIC CUPS SHALL BE USED TO FASTEN AND <br /> SUPPORT GROUNDING CONDUCTORS.FERROUS . Al <br /> METAL CLIPS WHICH COMPLETELY SURROUND THE <br /> GROUNDING CONDUCTOR SHALL NOT BE USED. <br /> 8. CONTRACTOR SHALL REPAIR/PLACE EXISTING t <br /> � z1111111 <br /> GROUNDING SYSTEM COMPONENTS DAMAGED DURING r .4t i <br /> CONSTRUCTION AT THE CONTRACTORS EXPENSE. Q w <br /> 9. ALL DETAILS ARE SHOWN IN GENERAL TERMS.ACTUAL Cl H- z <br /> INSTALLATION AND CONSTRUCTION MAY VARY DUE TO d w <br /> U <br /> SITE SPECIFIC CONDITIONS. o 2' <br /> 10. GROUND ALL ANTENNA BASES,FRAMES,CABLE RUNS. <br /> AND OTHER METALLIC COMPONENTS USING GROUND �, ALPHA ¢ <br /> WIRES AND CONNECT TO SURFACE MOUNTED BUS <br /> BARS.FOLLOW ANTENNA AND BTS MANUFACTURER'S 45• o 0 <br /> PRACTICES FOR GROUNDING REQUIREMENTS. ��� - w O <br /> GROUND COAX SHIELD AT BOTH ENDS AND EXIT FROM • A3 y Li <br /> - TOWER OR POLE USING MANUFACTURERS PRACTICES. Li <br /> 11. ALL WIRES SHALL BE COPPER THHWTHWN.ALL <br /> GROUND WIRE SHALL BE GREEN INSULATED WIRE , , W- <br /> ABOVEGROUND. . `�- HDI <br /> 12. CONTRACTOR TO VERIFY AND TEST GROUND SOURCE, 11'''1 <br /> GROUNDING AND OTHER OPERATIONAL TESTING WILL ®�����,,,, <br /> • BE WITNESSED BY WIRELESS REPRESENTATIVE. EXISTING SECTOR GROUND BAR /`� • \ <br /> 13. REFER TO DIVISION 16 GENERAL ELECTRIC;GENERAL LOCATED AT EACH SECTOR \ . <br /> ELECTRICAL PROVISION AND COMPLY WITH ALL (FIELD VERIFY LOCATION) /�` \ # <br /> REQUIREMENTS OF GROUNDING STANDARDS. -SEE DETAIL 5 ON SHEET G-2 �� \ OF,„ASI <br /> B 14 DESIGN ELECTRICAL <br /> OF GROUNDING SYSTEM,AND RECEIVETOR TO PROVIDE IED ' / ` r,„zs.. '1G�'e. <br /> APPROVAL OF DESIGN BY AUTHORIZED WIRELESS EXISTINGUAWGR GROUND LEADPFROMSECTOR <br /> REPRESENTATIVE,PRIOR TO INSTALLATION OF GROUND BAR TO TOWER TOP COLLECTOR <br /> VERIFY) <br /> �. ` Al <br /> GROUNDING SYSTEM.PHOTO DOCUMENT ALL GROUND BAR(FIELD VERIFY) ' ;at!c <br /> iI : :u1 <br /> CADWELDS AND GROUND RINGS. • w71d ‘5, <br /> CADWELDS NOTIFY CONSTRUCTION MANAGER IF THERE ARE ANY / J ` UKF'qb/ti)V.WV <br /> DIFFICULTIES INSTALLING GROUNDING SYSTEM DUE <br /> TO SITE SOIL CONDITIONS. / ,�•\ SS��NAL�.• <br /> �V <br /> 16. USE PANI SCHEME FOR LOADING GROUNDS ON MGB <br /> I\ <br /> AS DISCUSSED IN NSTD 119,33 6 38. , L'' 11►•1119 lll!• <br /> G1. ELECTRICAL <br /> ND ROD ECTRICAOTES: 06/06/2022 <br /> CONTRACTOR SHALL ORDER GROUND <br /> ` CO RESISTANCE TESTING ONCE THE GROUND SYSTEM <br /> HAS BEEN INSTALLED;A QUALIFIED INDIVIDUAL, / C4 a <br /> UTILIZING THE FALL OF POTENTIAL METHOD,SHOULD 'w <br /> PERFORM THE TEST.THE REPORT WILL SHOW THE v <br /> LOCATION OF THE TEST AND CONTAIN NO LESS THAN 9 <br /> • <br /> TEST POINTS ALONG THE TESTING LINE,GRAPHED OUT D_W �_ <br /> TO SHOW THE PLATEAU. ' O <br /> 2. POINT GROUND TEST OR 3 POINT 62%TESTS WILL NOT T Z Q Q <br /> BE ACCEPTED AS ALTERNATIVES TO THE AFORE 2 co Z <br /> MENTIONED GROUND TESTS.TEST SHALL BE U i ^ LU <br /> PERFORMED WHILE THE COUNTERPOISE IS ISOLATED / / NEW#2 AWG GROUND LEAD f�./ <br /> 1 FROM NEW NOKIA AEQK LL '- <br /> FROM THE NC SYSTEM GRIDS AND EXISTING ANTENNA TO EXISTING Nr NLLJ 2 <br /> COMMUNICATIONS FACILITY. / , 4—/ SECTOR GROUND BAR(TYP.) I.V Q W 0 U <br /> CELL REFERENCE GROUND BAR:POINT OF GROUND \ •� ' -SEE DETAIL 3 ON SHEET G-2 W C W LL ''/^� <br /> REFERENCE FOR ALL COMMUNICATIONS EQUIPMENT ` II , VI <br /> B1 > N <br /> • <br /> FRAMES.ALL BONDS ARE MADE WITH#2 STRANDED GREEN <br /> INSULATED COPPER CONDUCTORS.BOND TO GROUND \ I % W <br /> RING WITH(2)#2 SOLID TINNED COPPER CONDUITS 1 / <br /> (ATT-TP-76416 7.6.7). I / <br /> HATCH PLATE GROUND BAR:BOND TO THE INTERIOR • I <br /> GROUND RING WITH(2)#2 STRANDED GREEN INSULATED ' zock,,,,, <br /> � ISSUED FOR: <br /> COPPER CONDUCTORS.WHEN A HATCH-PLATE AND A CELL /�REFERENCE GROUND BAR ARE BOTH PRESENT,THE CELL , �f- REVIEW 09/3021 <br /> SITE REFERENCE GROUND BAR MUST BE CONNECTED TOTHE HATCH-PLATE AND TO THE INTERIOR GROUND RING L / PERMIT - <br /> USING(2)#2 STRANDED GREEN INSULATED COPPER B3 <br /> A CONDUCTORS. CONSTRUCTION•� / • - <br /> EXTERIOR CABLE ENTRY PORT GROUND BARS:LOCATED /, BETA RECORD - <br /> AT THE ENTRANCE TO THE CELL SITE BUILDING.BOND TO / 135' <br /> GROUND RING WITH A#2 SOLID TINNED COPPER <br /> DESIGNER <br /> CONDUCTORS WITH AN EXOTHERMIC WELD AND <br /> INSPECTION SLEEVE(ANT-TP-764167.6.7.2). PR hu R <br /> DURING ALL DC POWER SYSTEM CHANGES INCLUDING DC • CB CT <br /> 4. <br /> SYSTEM CHANGE OUTS,RECTIFIER REPLACEMENTS OR <br /> ADDITIONS,BREAKER DISTRIBUTION CHANGES,BATTERY I GPO JOB NO. <br /> • ADDITIONS,BATTERY REPLACEMENTS AND INSTALLATIONS 2021723.06.45587.01 <br /> OR CHANGES TO DC CONVERTER SYSTEMS IT SHALL BE B4 '1\ <br /> REQUIRED THAT SERVICES CONTRACTORS VERIFY ALL DC <br /> POWER SYSTEMS ARE EQUIPPED WITH MASTER DC O ANTENNA GROUNDING DIAGRAM x, <br /> SYSTEM RETURN GROUND CONDUCTOR FROM THE DC cc <br /> I\ <br /> POWER SYSTEM COMMON RETURN BUS DIRECTLY SCALE NOT TO SCALE <br /> Z <br /> CONNECTED TO THE CELL SITE REFERENCE GROUND BAR <br /> ZG .1 <br /> PER TP76300 SECTION H 6 AND TP76416 FIGURE 7-11 <br /> REQUIREMENTS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.