Laserfiche WebLink
Intake &Approval Sheet Aik (FOR PERMIT STAFF ONL19 PERMIT# Sc 0 "c9oq <br /> ler <br /> BUILDING •LANNING E aa(99''/6-6-" <br /> Intake OK by: Date: Intake OK bj _ Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone v <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W" Permit Proposed No. of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No.of Dwelling Units: <br /> Garage/Accessory Struct.Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu" Fee:Type: Amount$ <br /> Basement ❑No ❑Yes , Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System ❑Not Req'd Park Impact Fee Total$ <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd Permit Technicians:Apply Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: ❑ 100%Credit Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No ❑ 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes ❑No ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total $S 042i 00 Additional Notes: <br /> Approved By: Date: <br /> / PUBLIC WORKS <br /> Additional Notes: Intake OK by: 9 1L2 Date: 112-'21 Z?/ <br /> Intake Comments: PW Worksheet Needed if: <br /> O ( v OSys Dev Eval ❑Traffic Mit Eval <br /> Approved B*421.-4, Date: (f� zZ <br /> ed ❑Site Work or Drainage Proposed <br /> // / ❑Backflow Prevention for high hazard: <br /> Cv/ (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate I Deferred Submittals Required: ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm DOther: DThis project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑ This Permit is Approved by Public Works <br /> Fire Dept.Fees: 0 See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑ A Separate PW Permit is Required(Permit#: PW <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND 0 Is located in this folder • <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By: Date: ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ►4 r ublic Works has no scope---PW Not Required 1 <br /> ELECTRICAL/PLUMBING ''dditional Notes: <br /> Additional Notes: <br /> Approved By: Date: Approved By: Date: <br />