My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 9/27/2023 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 9/27/2023 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2023 10:06:58 AM
Creation date
9/29/2023 10:05:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
9/27/2023
End Date
12/31/2027
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility Project
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003228
Total Compensation
$11,329,235.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Brown and Caldwell Inc. 2/3/2022
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Amendment 1 PSA with Brown and Caldwell for Port Gardner Storage Facility Project <br />Exhibit A Scope of Work <br />36 <br />Task Assumptions <br />• City’s CM will administer and manage Requests for Information (RFIs), including processing and <br />tracking, screening for completeness, distributing to the appropriate reviewers, and returning <br />review comments to Contractor. <br />• RFIs with responses which change contract price or duration will be assigned a Change Order <br />Proposal Number and further tracked as a contract change. <br />• RFIs received beyond the estimated amount may require an increase to the anticipated level of <br />effort. <br />• Number of RFIs and hours is an estimate and may not reflect actual number of RFIs or time <br />required for RFI review. RFI metrics will be reviewed monthly and included in the monthly <br />progress report. <br />• RFI responses will be noted and tracked on Contractor’s redline record drawings and not through <br />reissuance of Contract drawings. <br />Everett Responsibilities <br />• Review and respond to RFIs to which the City has been assigned. <br />• Provide BC research materials and field access to respond to RFIs, as required. <br />Meetings <br />• Allowance of up to 100, 1-hour ad-hoc meetings/correspondence related to RFI issues resolution <br />and response. <br />Work Products <br />• RFI responses. <br />Task 600 – Construction Change Support <br />Objective: Coordinate and prepare change documentation with adherence to contract change <br />procedures. <br />Activities/Approach: This task includes the following activities: <br />• Prepare and/or review Change Proposals (by City/Engineer or by Contractor) screening for <br />completeness, distributing to the appropriate reviewers, and returning review comments to <br />Contractor. <br />• Assist City’s CM with research, design clarification and design changes transmitted to the <br />Contractor through Field Orders. Field Orders are written orders issued by the Owner’s <br />Representative that requires minor changes in the Work, but do not involve a change in the <br />Contract Sum or the Contract Time. It is presumed that force account allowances and unit bid <br />items falling under the Total Contract Sum will fall under Field Order authorizations. <br />• Coordinate with Discipline Engineering staff for design services where required. <br />• Review and provide comments on Contractor’s change order pricing. <br />Task Assumptions <br />• City’s 3rd party CM will administer and manage Change Documentation, including processing <br />change orders and field orders, changed work tracking, distributing change documentation, and <br />maintaining change logs. <br />• An estimated 333 change items is assumed with engineer design labor effort of 5 hours per <br />change item.
The URL can be used to link to this page
Your browser does not support the video tag.