My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Osborn Consulting 9/22/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Osborn Consulting 9/22/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2023 10:48:13 AM
Creation date
9/29/2023 10:47:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Osborn Consulting
Approval Date
9/22/2023
Council Approval Date
9/20/2023
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Regional Stormwater Facility Study
Tracking Number
0003951
Total Compensation
$476,665.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Everett <br />3rd Ave SE Water Quality Treatment Page 12 of 14 <br /> <br />Task 5.3 Conceptual Design Report <br />The Consultant will develop a Conceptual Design Report and associated package for ECOLOGY <br />review and acceptance. <br /> <br />City of Everett’s Responsibilities <br />1. City will provide input and review comments on the draft and final Report within the <br />agreed upon schedule. <br />2. Review Conceptual Design Report prior to submittal to Ecology. <br />3. Upload Conceptual Design Report and files for Ecology review. <br /> <br />Assumptions: <br />o Design figures will be reduced to 11x17 inches in size and be legible. <br />o The Report will include a summary for each Regional Facility (up to 5) and will <br />include the following information: <br />1. Sizing of Stormwater Features - Estimate size of regional facilities for <br />treatment and flow control. <br />2. The existing conditions and recommended conceptual design strategy for <br />stormwater conveyance modifications, regional facilities, and shared spaces. <br />Identify areas where the typical strategy will be modified to address physical <br />site constraints. <br />3. Identify subsurface variation with potential impacts to the site <br />recommendations and provide a brief description of subsurface testing needed <br />to complete the design. <br />4. Design Exhibits - Concept level exhibits based available on GIS and aerial <br />data of the design strategy in both plan and schematic cross-section views. <br />5. Refine Cost Estimate – Refine the cost estimate to address any changes <br />identified during the development of the conceptual design. <br /> <br />Deliverables <br />· Draft Conceptual Design Report for City and Ecology review. <br />· Final Conceptual Design Report with a formal response to Ecology comments. <br /> <br />Task 5 Regional Stormwater Facility Plan <br /> <br />The purpose of this task is to prepare a regional Stormwater Facility Plan meeting the <br />requirements of EMC 14.28.070. <br /> <br />Task 5.1 Regional Facility Plan document <br />Prepare a document summarizing the purpose of the regional facility plan, how it was prepared <br />and how it should be implemented. This can draw on the study, but needs to be the document
The URL can be used to link to this page
Your browser does not support the video tag.