My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2317 BROADWAY 2023-12-06
>
Address Records
>
BROADWAY
>
2317
>
2317 BROADWAY 2023-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 11:14:57 AM
Creation date
10/2/2023 8:33:39 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2317
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet OFOR PERMIT STAFF ONLY) PERMIT#?ZO3O2j, <br /> BUILDING PLANNING <br /> Intake OK by: Date:. Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No.of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No.of Dwelling Units: <br /> Garage/Accessory Struct.Size Planning/Landscape Inspection Required before Final? DYes ❑No <br /> Number of Stories "In Lieu"Fee:Type: Amount$ <br /> Basement ❑No ❑Yes , Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group DEverett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System ❑Not Req'd Park Impact Fee Total$ <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd Permit Technicians:Apply Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? DYes 0 No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? DYes El No ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ Additional Notes: <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: JPW Worksheet Needed if: <br /> 'OSys Dev Eval OTraffic Mit Eval <br /> Approved By: Date: ❑Site Work or Drainage Proposed <br /> OBackflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT 'supportive housing) <br /> Separate/Deferred Submittals Required: DRoute this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm DOther: OThis project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND OCreate Green Folder ❑Submitted Previously ❑Deferred <br /> O This Permit is Approved by Public Works <br /> Fire Dept.Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE 0 A Separate PW Permit is Required(Permit#: PW ) <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE 0 Is in a Separate Green Folder coin with this folder for permit Issuance) <br /> Approved By: Date: El Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ❑ Public Works has no scope---PW Not Required <br /> Ir PLUr MBING�_ Additional Notes: <br /> Additional Notes: <br /> Approved By: lit,-- Date: 7//7 <br /> 73 Approved By: Date: <br />*kfiSionS rio PI ns Previously_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.