My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2815 BAKER AVE 2023-12-06
>
Address Records
>
BAKER AVE
>
2815
>
2815 BAKER AVE 2023-12-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 9:11:30 AM
Creation date
10/2/2023 10:06:46 AM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet •(FOR PERMIT STAFF ONLY) di PERMIT# 27_, I Z_d Z 0 <br /> BUILDING ' 11LANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Date: <br /> Intake Comments: Intake Comments: AO ,f cA md <br /> Zone 1-40 <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W" Permit Proposed No. of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No. of Dwelling Units: <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? ❑Yes Ilo <br /> Number of Stories 3 "In Lieu"Fee:Type: Amount$ <br /> Basement ❑No ®Yes , Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction 0 Calculated: C dit: P....j___P_c— <br /> Occupancy Group 5 /,j=/`Y(r/3 ❑Everett School Dist ❑Mu ' eo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for r 1/1/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System Plot Req'd Park Impact Fee Total$ (n due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Ye <br /> Fire Alarm: ❑Update Existing ❑New System jjlot Req'd Permit Technician Use Only:App Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/ 22-9/2/20220 I k <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes in No 0 50%Credit-Issued 9/ /2022-6/2/2023 <br /> Add'I RCW 64.55 does required prior to final? ❑Yes IINo 0 0%Credit-Issued /3/2023 or later <br /> VALUATION CALCULATION: Total$5 / 33y. oo Additional Notes: <br /> Approved By: L,1 Date: ' �� ,-2,3 <br /> UBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: PW Worksheet Needed if: <br /> ❑Sys Dev Eval(Util/SW) ❑Traffic Mit Eval <br /> Approved By: Date:p�d// �� ❑Site Work/Drainage ❑Address Letter <br /> / ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: El Route this folder for PW Review at end ---PW Review Worksheet <br /> El Fire Sprinklers El Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept. Fees: 0 See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE 0 A Separate PW Permit is Required(Permit#: PW ) <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND 0 Is located in this folder <br /> g Review/Inspection Scope-ADD FIRE FEE 0 Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By:K e��>11 Date: 3....6) .3 0 Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> ef-Rublic Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: -- - <br /> Approved By: Date: Completed By. a,„),.'-- , Date: 3/0 4+2423 <br />
The URL can be used to link to this page
Your browser does not support the video tag.