Laserfiche WebLink
Helion Energy Shielding Structure-Foundation July 11, 2023 <br /> Helion Energy <br /> The following signed structural observation report serves as acknowledgment by PSE that the structural work <br /> as depicted in the project contract documents has been constructed in substantial compliance with the <br /> drawings and specifications. <br /> -LIE 40 <br /> Thank you and please call if you have any questions. �c.OE W ASyGyc�y <br /> Sincerely, <br /> lnoa4ti� g� 21 844 <br /> Mackenzie Lostra, PE o�Fs'S�O <br /> NA. <br /> E�G\��. <br /> Project Engineer <br /> Peterson Structural Engineers Inc. <br /> Sent via email to Paul Gentsch on 7/11/2023<paul@helionenergy.com> <br /> PAGE 4 <br />