Laserfiche WebLink
0 "0T 1 aOHN <br /> iil 4OF wASh.$'4 <br /> v 6 4 <br /> IF TNS BM 1 DOES NOT 3 y n91 -QO' <br /> " MEASURE 1'TIEN DRAWING Z <br /> LS NOT TO SCALE <br /> 1 1,1,,04H224 p�'�Q <br /> O TONAL E,4 `,4' 11 <br /> f'IONAL ENO\ 'T'' <br /> CEILING CONNECTION CEILING CONNECTION CEILING PANEL BEAMS <br /> TO TRANSVERSE WALL CEILING PANEL BEAMS TO LONGITUDINAL WALL SHOWN SCHEMATICALLY, ` H <br /> PER DETAIL 0 SHOWN SCHEMATICALLY, PER DETAIL© SEE SHEETS SS6-SS10 <br /> SEE SHEETS SS6-SS10 FOR DETAILS 10'-0"x7'-6" CONC. _ �m <br /> COUPLERS ® EA. BLOCK TYP. FOR DETAILS TYP. PILASTERS BEYOND "+ o <br /> COURSE TO CONNECT _ ® 1 ® a0'-o" �I �o� <br /> VERT. RODS, SEE INI�ITIMITIMITIMITI�IT1�1II1 /J J —1_ I �2 n <br /> SHEETS SS11-SSi3 FOR ' H�f��1��11�1■11l■■1■■1l - .I Llr+� �_: 1�_g^ I ti 3 4 a e + = 3 T m <br /> DETAILS, ttP. ■ ■■ - _ o<- <br /> ���l��L�1l��L�\��'� z r COURSE 5 e B�OCKECOUR EAT H �af. <br /> VERT. 1"0 A449 HIGH r€ f -- � S 0 -i° <br /> STRENGTH THREADED RODS ..O'er - ilV.I <br /> Er CONNECT VERT. RODS, mo" <br /> CONNECTING CONC. BLOCK t� _.. VERT. 1t "0 A449 HIGH I - VERT 3'i 0 THREADED ROD i SEE SHEETS o CL IL ,f <br /> COURSES, SEE SHEETS 3 VERT. 3�"0 THREADED ROD _ COURSE 4 STRENGTH THREADED RODS - CONNECTING BPE BLOCK SS11-SS73 FOR <br /> SS11 SS13 FOR DETAILS i �g CONNECTING BPE BLOCK - CONNECTING CONC. BLOCK - COURSES, TYP. SEE SHEETS - DETAILS, ttP. / <br /> is 1 '-' COURSES TYP. SEE SHEETS '� ' COURSES, SEE SHEETS "_ SS11-SS13 FOR DETAILS a <br /> . '^��' Po <br /> 6" JOGS IN BPE BLOCKS, SS11-SS13 FOR DETAILS """ SS11-SS13 FOR DETAILSNI <br /> � �-- % 6" JOGS IN BPE BLOCKS, _�� I <br /> O } O CONC. WALL BLOCK 5 1": _�_ - - - I S6ei_...---- C9 (n <br /> KEY, SEE SHEETS DON'T ALIGN WITHALTERNATE N SO CONC.SEAMS - COURSE 3 `3 �>� DON'ALTET ALIGN WITHNATE NCONC.SO SEAMS -- � Z W H- <br /> DETA SS13 FOR CONC. WALL BLOCK 9i <br /> DETAILS, ttP. BLOCK SEAMS BEYOND, TYP. WI KEY, SEE SHEETS BLOCK SEAMS BEYOND, TYP. ZI 1n m <br /> a 1 _ VERT. CLEAR, HORIZ. TIN THREADED RODS 1 SStt-SS13 FOR �slj� VERT. CLEAR, ��II I RODS CONNECTING BPE Z x< <br /> 5'-0"x5'-0"x2'-6" CONNECTING BPE BLOCKS TO c _ Tt DETAILS, ttP. BLOCKS TO CON W <br /> CONC. BLOCKS, TYP., mmot CONC. TO BPE CONC. BLOCKS, TYP, SEE M � CONC. TO BPE BLOCKS E SHEET J O <br /> STAGGER BETWEEN .- SHEETS SS11-S513 FOR DETAILS "'" IN O r " <br /> COURSES - 2'-6" THK. BPE '""' %- COURSE 2 I ,= I SS11-SS 3PFORE DETAILS W <br /> ,- '� �" 5'-0"x5'-0"x2'-6" 3s 2'-6" THK. BPE T ��` _ <br /> 1�� - BLOCKS, ttP., STAGGER BPE BLOCK CONC. BLOCKS, TYP., � � BLOCKS, TYP., STAGGER I W <br /> (E) 10" BETWEEN COURSES COURSE 1 VERT I miW j BPE BLOCK IriI <br /> IX <br /> S.O.G., TYP. Minn ROD CONNECTION STAGGER BETWEEN ��� BETWEEN COURSES COURSE 1 VERT I' 1. W <br /> _ ' PER DETAIL© :- - "' COURSES rs5+�--\ ROD CONNECTION�. <br /> I COURSE 1 MLW 1 <br /> (E) AS THK. i � F `► i (E) 10" ®�; II <br /> PER DETAIL ON I _ <br /> PRECAST CONC. S.O.G., I <br /> WALL, TYP. 111N I• . - — I ..... I--' <br /> I �'. I I TYP I I I D <br /> '+ <br /> .Yr" <br /> (N) 3'-0" MAT FOUNDATION, I <br /> -,' WALL ANCHORAGE AND REIN. NOT SHOWN FOR - 0 <br /> WALL ANCHORAGE AND 3'-0" MAT FOUNDATION, — <br /> (N) MAT FOUNDATION CLARITY, SEE SHEETS (N) MAT FOUNDATION REIN. NOT SHOWN FOR <br /> PER SHEETS SF4-SF7 CLARITY, SEE SHEETS <br /> (N) FOOTING LINE PER SHEETS SF4-SF7 SF1-SF7 FOR DETAILS SF1-SF7 FOR DETAILS <br /> L.LJLi <br /> BEYOND, TYP. — Li <br /> LONGITUDINAL ENCLOSURE SECTION O TRANSVERSE ENCLOSURE SECTION O = D__ <br /> 3/16" = 1'-0" 3/16" = 1'-0" <br /> 2 V) <br /> CEILING PANEL BEAMS rr <br /> SHOWN SCHEMATICALLY, <br /> Vrn� <br /> SEE SHEETS SS6-SS10 <br /> FOR DETAILS <br /> CEILING CONNECTION LJ__I <br /> TO PILASTER PER 5' 0" 40'-0" 4.-f 5-0' W DETAIL© ' SH I,E1 <br /> FFT NOTES: Z <br /> � • •, • - 1. EXISTING CONFIGURATION, GEOMETRY, AND ELEVATIONS ARE BASED ON (n N <br /> �TYp. A TOME 'r�'_I�,rJ —.rJ.® r,J. .®1l��'# 1-9 DRAWINGS PREPARED BY LANCE MUELLER & ASSOCIATES FOR THE W }N 00 <br /> -, (= _ y „---1 1 -EVERETT TECH" BUILDING ADDENDUM #2 DATED AUGUST 20, 2021. O _. m <br /> CONTRACTOR TO VERIFY GEOMETRY IN FIELD AND NOTIFY THE PROJECT Lil U1 <br /> ENGINEER IF CONFLICTS OR DISCREPANCIES EXIST. Z ~ = W Q <br /> 2. SEE SHEET SS3 FOR WALL PLANS AND BPE SCHEDULE AND SHEETS U (n Z I <br /> MN--- - XII -- SS11-SS13 FOR WALL BLOCK DETAILS. O F-- LU L j <br /> 3. FOUNDATION REINFORCING AND ANCHORAGE IS NOT SHOWN FOR CLARITY. <br /> I 2'-6"THK. l SEE SHEETS SF1-SF7 FOR DETAILS _I ( W Z <br /> 4. BPE BLOCKS SHALL BE ASSEMBLED OF BPE MATERIALS SUCH THAT THEY -D O Fr)ct <br /> r's"•- BPE, ttP. BEHAVE AS RIGID ELEMENTS. CONTRACTOR/OWNER TO SUBMIT MEANS OF W I— 0 J —W <br /> ___._ ASSEMBLY FOR BPE WALL BLOCKS. _ (n a_Ct = -ZJ <br /> �H": �i. __ _ _ 5. BPE BLOCK JOGS SHALL BE 6"WIDE BY 6"THICK AND LOCATED TO <br /> 10'-0"x7'-6" CONC. PILASTERS 20'-6" PASS-THROUGHS ..,=,-- ENSURE THAT BPE BLOCK SEAMS ARE NOT CONTINUOUS THROUGH THE FULL <br /> 22'-0" DEPTH OF THE BPE BLOCK. BPE BLOCK JOGS SHALL BE OFFSET 6" FROM LM1y <br /> w/ PASS-THROUGHS, REIN. VERT. CLEAR, <br /> NOT SHOWN FOR CLARITY, TYP. ----- - - CONC. TO BPE CONT. THROUGH THE CONNECTED CONCRETE BLOCK SEAMS. 8 <br /> ,` BPE, TYP. - _,___-_-- 6. PILASTERS SHOWN SCHEMATICALLY. SEE SHEET SS14 FOR PILASTER DETAILS. N <br /> HORIZ.Xz"0 THREADED 7. UNLESS PROVIDING TEMPORARY ACCESS TO THE INTERIOR OF THE SHIELDING N <br /> ./� STRUCTURE, ALL WALL BLOCKS AND CEILING PANEL BEAMS SHALL BE w <br /> mai <br /> ROD CONNECTING BPE _ INSTALLED AND POSITIVELY CONNECTED USING THE CONNECTION HARDWARE <br /> PANEL TO PILASTER DETAILED HEREIN. SAFE OPERATION OF THE STRUCTURE AND COMPONENTS <br /> (E) 10" PER DETAIL 0 = DURING TYPICAL USE OR WHILE PROVIDING INTERIOR ACCESS IS THE <br /> LJJ <br /> S.O.G., TYP. - ,-' -- Mr RESPONSIBILITY OF THE OWNER. <br /> SHEETI <br /> NOTE: FY <br /> - i -- - r DRAWINGS SHOW FULLY ASSEMBLED STRUCTURE. Z <br /> :/,--2,_0,,f-7-_, <br /> - - WHEN BLOCKS ARE MOVED DURING CONSTRUCTION, w (1 <br /> OR DURING OPERATION TO ACCESS THE INTERIOR �Z 0 O <br /> OF THE SHIELDING STRUCTURE, THE OPERATOR 0 J F- <br /> SHALL ENSURE THAT CONCRETE"' 6. '.. I -. MOVED AND STACKED WITH CARE AAS NOT AREND BPE O 0 <br /> I - DAMAGE ANY ELEMENTS. v'ri LZ N <br /> I (N) 3'-0" MAT FOUNDATION, <br /> \ REIN. NOT SHOWN FOR <br /> --.�WALL ANCHORAGE AND CLARITY, SEE SHEETS <br /> (N) MAT FOUNDATION SF1-SF7 FOR DETAILS JOB No. <br /> PER SHEETS SF4-SF7 2202-0023 <br /> 1~ <br /> DRAWN CHECKED <br /> NRW WJS <br /> TRANSVERSE SECTION 0 PILASTERS O DATE 09/02/22 <br /> 3/16" = 1'-0" REVISIONS <br /> SHEET SS5 <br /> 13 OF23 <br />