Laserfiche WebLink
OTTO ROSENAU & ASSOCIATES, INC. <br /> Geotechnical Engineering, Construction Inspection & Materials Testing <br /> CONCRETE REPORT <br /> Job Number: 22-0835b Report Number: RC452781 Permit Number: B2208-109 <br /> Project: Middle Earth Holdings Foundation-Phase 2 Client: Helion Energy, Inc. <br /> Address: 1313 75th St SW, Everett Date: 02/22/2023 <br /> Inspector(s): John Fraser <br /> Description/Location: Project Foundation slab. Concrete delivered and tested as delivered from mixing plant per contractor request <br /> Ref: ORA report#452780. **Per project design requirements, Boron Carbide powder w/Glenium added to <br /> specified concrete loads <br /> ***See notes for admixture details <br /> Rebar Verified: Yes 2/22/2023 John Fraser(Grade 60) Mfg: Cascade <br /> Placement Data Design Actual ❑ Batch Weights/Cubic Yard <br /> Supplier: Cadman Cement(lbs/type): 465# Type: PLC <br /> Mix Number: PPECC51K Fine Agg. (lbs): 1482# <br /> Slump Spec: 29"±3" Coarse Agg. (lbs/size): 1388##8 Slag (lbs): <br /> W/C Ratio Spec: .381 Coarse Agg. (lbs/size): <br /> Air Spec: n/a Coarse Agg. (lbs/size): <br /> Total Yards: 480 Fly Ash (lbs): 310# <br /> Placed Via: Tailgate Water(Ibs or gal): 35 gal. <br /> Consolidated: No Admixtures (specify): 45 oz.GLENIUM 7500, 16 oz.VMA 358 <br /> Required Strength: 5000 psi @ 28 days <br /> Sampling and Testing Data Time Cubic Water Slump Air% Conc.Temp Ambient Truck Ticket <br /> ASTM C 172, C 31 Made Yards Added C 143 C 231 C 1064 Temp No. No. <br /> Cast Samples: 1-7 4:15 am 9.00 10 gal. 32" n/a 60°F 33°F 507 1361168 <br /> Cast Samples: 8-11 5:00 am 80.00 5 gal. 29" n/a 59°F 33°F 347 1361174 <br /> Cast Samples: 12-15 7:00 am 150.00 5 gal. 28.25" n/a 58°F 34°F 506 1361185 <br /> Cast Samples: 16-19 9:00 am 225.00 0 gal. 27.5" n/a 58°F 33°F 366 1361215 <br /> Cast Samples: 20-23 11:00 am 300.00 0 gal. 27.25" n/a 59°F 35°F 507 1361275 <br /> Cast Samples: 24-27 11:45 am 400.00 0 gal. 28.75" n/a 55°F 35°F 366 1361298 <br /> Cast Samples: 28-31 1:00 pm 480.00 0 gal. 27.5" n/a 57°F 36°F 430 1361314 <br /> Weather: Inside Slump Range: n/a Air% Range: n/a <br /> Date Samples Picked Up: 2/23/2023 Initial Curing Method: ASTM c31,Exclude c31-12.1.5 Initial Curing Tmp: ASTM c31,Exclude c31-10.1.2 <br /> Comments <br /> The samples represented in this report reflect the concrete mix after Boron Carbide(BC)was added prior to placement in the structural <br /> slab. -Per EOR direction, (20) bags of BC were added to each mixer as they arrived for delivery *The 5th and 4th from last mixers had <br /> only(10)bags each added, as the supply of BC had run low <br /> **The 3rd. 2nd from last and the last mixer had no BC added, as the supply had run out. EOR was aware and approved placement of all <br /> noted concrete mix <br /> REINFORCING/PLACEMENT: Conforms:❑� Does Not Conform: ❑ <br /> See attached for additional test results <br /> Copies to: �/ �� Date: 2023.03.09 <br /> ❑ Client ❑d Engineer WOthers sm" 13:24:40 _08'00' <br /> ❑d Owner ❑d Contractor Technical Responsibility: <br /> ❑ Architect ❑d Building Dept Isaac Ruoff, Project Manager <br /> This report applies only to the items tested or reported and is the exclusive property of Otto Rosenau&Associates, Inc. Reproduction of this <br /> report except in full,without written permission from our firm is strictly prohibited. <br /> 6747 M.L. King Way S.,Seattle,Washington 98118-Phone(206)725-4600-Fax(206)723-2221 <br /> Form No.:ADMIN-62c-04 (Rev 09/06) Page 1 of 2 <br />