My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1313 75TH ST SW 2023-12-11
>
Address Records
>
75TH ST SW
>
1313
>
1313 75TH ST SW 2023-12-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 9:09:35 AM
Creation date
10/2/2023 12:13:22 PM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1313
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hayden LeBlonde <br /> From: Nick Welling <Nick.Welling@psengineers.com> <br /> Sent: Friday, February 24, 2023 5:02 PM <br /> To: Paul Gentsch <br /> Cc: Bill Sandbo; Mackenzie Lostra; Hayden LeBlonde; Kiel Lunsford <br /> Subject: RE: Helion Energy Shielding Structure Foundation - Structural Observation #3  <br /> Report - [PSE 2202-00231 <br /> Attachments: Re: Helion Form Savers Adjustments <br /> Hi Paul, <br /> To our best understanding,the main structural issues appeared to be resolved or they were taking action to address <br /> them by the time of SO#4.The main exception to this is the pilaster dowel form saver elevations that were challenging <br /> to get "perfect", but Andersen gave us a heads up on this and Bill previously provided input on a solution if it proved to <br /> be an issue (see email on 2/15/23 subject line: Re: Helion Form Savers Adjustments). <br /> In general,the reinforcing looked good to us and we thought Andersen did a great job of navigating some unique <br /> challenges and working with us on solutions. It was exciting to set this portion of the design realized and we're looking <br /> forward to seeing the finished product in the near future. <br /> Thanks, <br /> Nick <br /> Nick Welling, PE <br /> Associate Project Manager <br /> Direct 1253.328.6726 <br /> Connect with me on Linkedln <br /> Licensed in:WA <br /> PSE <br /> PETERSON STRUCTURAL ENGINEERS <br /> From: Paul Gentsch <paul@helionenergy.com> <br /> Sent: Friday, February 24, 2023 4:16 PM <br /> To: Nick Welling<Nick.Welling@psengineers.com> <br /> Cc: Bill Sandbo <Bill.Sandbo@psengineers.com>; Mackenzie Lostra <mackenzie.lostra@psengineers.com>; Hayden <br /> LeBlonde<hleblonde@andersen-const.com>; Kiel Lunsford <klunsford@Andersen-Const.com> <br /> Subject: Re: Helion Energy Shielding Structure Foundation -Structural Observation#3  Report- [PSE 2202-0023] <br /> Thanks for the info Nick- looks generally good to me. Outstanding issues seem like they were solvable before the pour, <br /> and we should know soon if they weren't. <br /> Much appreciated, <br /> Paul <br /> From: Nick Welling<Nick.Welling@psengineers.com> <br /> Sent: Friday, February 24, 2023 10:34:58 PM <br /> To: Paul Gentsch <paul@helionenergy.com> <br />
The URL can be used to link to this page
Your browser does not support the video tag.