My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY AARONS 2023-12-07
>
Address Records
>
EVERGREEN WAY
>
7601
>
AARONS
>
7601 EVERGREEN WAY AARONS 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 10:57:44 AM
Creation date
10/3/2023 7:09:16 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
AARONS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2306-206 Description:TI, RELOCATE LIGHT SWITCHES, RECEPTACLES, EXISTING <br /> CIRCUITS <br /> Applied:6/22/2023 Approved: 6/23/2023 Site Address: 7601 EVERGREEN WAY STE C1 <br /> Issued:6/23/2023 Finaled: 7/20/2023 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant:JOSH MOORE <br /> Parent Permit: B2303-019 Owner:COLUMBIA CASCADE PLAZA LLC <br /> Parent Project: Contractor: MOORE POWER LLC <br /> Details: <br /> Relocate Light switches,relocate receptacles,existing circuits <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/27/2023 6/27/2023 ELEC 06-ROUGH IN MICHAEL APPROVAL WALL ROUGH IN <br /> WICKLANDER <br /> Notes: <br /> AJHORNEY@ICLOUD.COM <br /> 256-294-3346 <br /> Approve Ruffin in new walls in the south end of the building also to cut in boxes in the middle suite.The remainder is existing and they are swapping out <br /> receptacles.Like and kind.This does not include anything above the T grid.All ceiling is closed,and they are reusing existing. <br /> 7/5/2023 7/5/2023 ELEC 07-TGRID MICHAEL CORRECTION as noted <br /> WICKLANDER REQUIRED <br /> Notes: <br /> Expose all pathways from beginning to end for all AV equipment. <br /> 7/5/2023 7/5/2023 ELEC 10-FINAL MICHAEL NOT READY as noted <br /> WICKLANDER <br /> Notes: <br /> AJHORNEY@ICLOUD.COM <br /> 256-294-3346 <br /> See notes on T grid inspection,not ready for final.cameras not installed,AV equipment,not installed. <br /> 7/14/2023 7/14/2023 ELEC 06-ROUGH IN MICHAEL APPROVAL <br /> WICKLANDER <br /> Notes: <br /> AJHORNEY@ICLOUD.COM <br /> 256-294-3346 <br /> MHW changed Inspection Type from ELEC 10-FINAL to ELEC 06-ROUGH IN <br /> MHW changed Inspection Type from ELEC 10-FINAL to ELEC 06-ROUGH IN <br /> Corrections made approve Rough in/tgrid <br /> 7/19/2023 T 7/19/2023 ELEC 10-FINAL MICHAEL APPRVD-PERMIT <br /> WICKLANDER FINAL <br /> Notes: <br /> AJHORNEY@ICLOUD.COM <br /> 256-294-3346 <br /> Cameras installed approve final complete <br /> I <br /> Printed:Thursday,20 July, 2023 1 of 2 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.