My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7601 EVERGREEN WAY AARONS 2023-12-07
>
Address Records
>
EVERGREEN WAY
>
7601
>
AARONS
>
7601 EVERGREEN WAY AARONS 2023-12-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 10:57:44 AM
Creation date
10/3/2023 7:09:16 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7601
Tenant Name
AARONS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2303-019 Description: EXPAND INTO ADJACENT SPACE,WALLS,RESTROOMS, <br /> FLR,FIXTURES <br /> Applied:3/7/2023 Approved:4/6/2023 Site Address: 7601 EVERGREEN WAY STE C1 <br /> Issued:6/21/2023 Finaled: 7/21/2023 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant: KELLY LEY <br /> Parent Permit: Owner:COLUMBIA CASCADE PLAZA LLC <br /> Parent Project: Contractor:ARCHER SERVICES GROUP INC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/28/2023 6/29/2023 FIRE 02-BLDG PRE- BRONSON CORRECTION <br /> FINAL FOR FIRE PEARSON REQUIRED <br /> Notes: <br /> Jimmy Shane 256-294-3346 <br /> Pre-final inspection.Advised that all 3 front doors must have single action hardware to exit. <br /> 6/30/2023 6/30/2023 BLDG 08-FRAMING Matt Schreifels APPROVAL <br /> Notes: <br /> AJHORNEY@ICLOUD.COM <br /> 256-294-3346 <br /> 7/3/2023 7/3/2023 BLDG 10-DRYWALL Matt Schreifels APPROVAL <br /> NAILING <br /> Notes: <br /> 7/6/2023 7/6/2023 BLDG 16-FINAL RAKEEB KHAN CANCELLED <br /> Notes: <br /> AJHORNEY@ICLOUD.COM <br /> 256-294-3346 <br /> Contractor to reschedule online.Thought inspection was another day.Is not ready for a final.Need all sub permits final approval. <br /> Contractor to reschedule online.Thought inspection was another day. Is not ready for a final.Need all sub permits final approval. <br /> 7/18/2023 7/18/2023 BLDG 16-FINAL Matt Schreifels CORRECTION <br /> REQUIRED <br /> Notes: <br /> AJHORNEY@ICLOUD.COM <br /> 256-294-3346 <br /> Need to add vertical grab bar and pipe insulation cover under sinks in bathrooms. <br /> Reschedule for building final once all sub permits and fire has received final approval. <br /> 7/18/2023 7/18/2023 FIRE 03-BLDG FINAL I MICHAEL WISLER APPROVAL <br /> FOR FIRE <br /> Notes: <br /> I <br /> Printed:Wednesday, 27 September, 2023 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.