Laserfiche WebLink
MacDonald-Miller <br /> FACILITY SOLUTIONS <br /> NEBB CERTIFIED <br /> TEST, ADJUST & BALANCE REPORT <br /> FOR <br /> BRIGHT HORIZON EVERETT <br /> JOB#: 73234146 <br /> 2929 N PERIMETER ROAD <br /> EVERETT, WA 98204 <br /> MECHANICAL ENGINEER: MACDONALD-MILLER <br /> PROJECT MANAGER: ROB PAINTER <br /> MECHANICAL CONTRACTOR: MACDONALD-MILLER <br /> THE DATA PRESENTED IN THIS REPORT IS A RECORD OF SYSTEM MEASUREMENTS AND <br /> FINAL ADJUSTMENTS THAT HAVE BEEN OBTAINED IN ACCORDANCE WITH THE CURRENT <br /> EDITION OF THE NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND <br /> BALANCING OF ENVIRONMENTAL SYSTEMS. THE MEASUREMENTS SHOWN, AND THE <br /> INFORMATION GIVEN, IN THIS REPORT ARE CERTIFIED TO BE ACCURATE AND COMPLETE, AT <br /> THE TIME AND DATE INFORMATION WAS GATHERED. ANY VARIANCES FROM DESIGN <br /> QUANTITIES, WHICH EXCEED NEBB TOLERANCES, ARE NOTED IN THE TEST-ADJUST-BALANCE <br /> REPORT PROJECT SUMMARY. <br /> SUBMITTED AND CERTIFIED BY: DARRIN WILLIAMS REPORT DATE: 7.5.2023 <br /> CERTIFICATION NUMBER: 2661 <br /> EXPERATION DATE: 3.31.2024 <br /> 8 AR IN <br /> AMS <br /> TIM ATION <br /> 2 1 <br /> E 131126 <br /> d'C NYd=on c Fcs3 <br /> MACDONALD-MILLER FACILITY SOLUTIONS MECHANICAL SERVICES#2661 <br /> 17930 INTERNATIONAL BOULEVARD,SUITE 120 <br /> SEATAC,WASHINGTON 98188 <br /> PHONE:(206)763-9400 FAX:(206)767-6773 <br />