Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 127 <br />1-09.7 Mobilization <br />Supplement 1-09.7 by adding the following: <br />(s) 1. Construction Identification Signs: Upon commencement of Work, the <br />Contractor shall furnish and erect two Project/Construction Identification Signs in <br />accordance with COE Standard Drawing No. 714, one at each end of each work <br />area at Engineer approved locations. <br />a. Contractor shall provide sign painting, lettering and detailing by a professional <br />sign maker with Engineer approval prior to placement on job site. <br />b. Contractor shall provide a Project Information Sign for each of the two <br />Project/Construction Identification Signs. Attach Project Information Sign to <br />the surface of the sign face in accordance with COE Standard Plan No. 714. <br />The Construction Identification Sign shall contain the following three lines of <br />information that the Engineer will provide: <br /> PROJECT NAME: <br />PROJECT FUNDING: <br />PROJECT COST: <br />c. The Contractor shall display Ecology’s logo in a manner that informs the <br />public that the project received financial assistance from the Washington <br />State Stormwater Grant Program. This information shall be incorporated into <br />the project sign <br />d. Contractor shall maintain signs and sign frames in a clearly legible condition <br />throughout the progress of the Work and shall completely remove signs upon <br />project completion. Deliver signs to the City's storage area for future City <br />use. <br />e. No separate payment for Project/Construction Identification Signs will be <br />made. All costs associated with this item shall be merged with the unit <br />contract price for "Mobilization." <br />(t) 2. Engineer's Field Office: The Contractor shall provide an office for the use <br />of the Engineer that may be in conjunction or attached to the Contractor's field <br />office. Sanitary facilities shall be nearby. The location of the office shall be <br />adjacent to the project and at a location acceptable to the Contractor and the <br />Engineer. The office shall be equipped with a desk, layout table, chairs and <br />telephone and suitable lighting, air conditioning and heating. A telephone shall <br />be installed for the sole use of the Engineer. It shall be a separate unit with a <br />different telephone number than the Contractor's phone. Mutually agreeable <br />measures for the security of the office shall be arranged between the Contractor <br />and Engineer. The Engineer's office shall be on-site, connected to all utilities <br />and fully prepared for occupancy prior to release of the first warrant to the <br />Contractor. <br />a. All costs for the Engineer's office, including telephone service for local calls <br />only, shall be borne by the Contractor and shall be included in the <br />mobilization cost. <br />1-09.9 Payments <br />Delete 1-09.9 and substitute the following: