My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 140 <br />types and amounts of Contractor Overhead Costs on no greater <br />than a monthly basis for the actual Project duration. <br />1-09.11A(4)A1c Overabsorbed Overhead <br />To demonstrate that Contractor did not incur Overabsorbed Overhead in <br />the period following the Delay, in accordance with item 5 of 1- <br />09.11A(4)A1. of these Special Provisions, the Contractor shall: <br />1. Affirmatively represent and warrant that completion of the <br />delayed Work prevented the performance of other Work; <br />2. Identify the critical resource unavailable for other Work due to <br />completion of the delayed Contract; and <br />3. Showing that unavailability of this critical resource precluded the <br />performance of other Work. <br />1-09.11A(5) Inefficiencies <br />1-09.11A(5)A Adjustment of Contract Sum <br />To the extent Contractor is entitled to an increase in Contract Sum because of <br />inefficiencies or impaired productivity, then compensation due, if any, shall be <br />calculated as provided in 1-09.4 EQUITABLE ADJUSTMENT. There is no <br />entitlement to increase in Contract Sum for inefficiencies to the extent caused <br />by a Third Party or a Force Majeure Event. <br />1-09.11A(5)B Adjustment of Contract Time <br />To the extent Contractor is entitled to an extension of Contract Time because <br />of inefficiencies or impaired productivity, then the extension shall be determined <br />as provided in 1-08.8 EXTENSIONS OF TIME. <br />Delete all of 1-09.12 and substitute the following: <br />1-09.12 Audits <br />(******) <br />1-09.12(1) General <br />The Contractor’s records relating to this Project, including, but not limited to, wage, <br />payroll, and cost records, shall be open to inspection or audit by representatives of the <br />City during the Project and for a period of not less than six years after the date of Final <br />Acceptance of the Contract. The Contractor shall retain these records for that period. <br />The Contractor shall also guarantee that Project records of Subcontractors, suppliers, <br />and lower tier subcontractors, including, but not limited to, the wage, payroll, and cost <br />records, shall be retained and open to similar inspection or audit for the same period of <br />time. The audit may be performed by employees or representatives of the City or by an <br />auditor chosen by the City. The Contractor, Subcontractors, or lower tier subcontractors <br />shall provide adequate facilities, reasonably acceptable to auditor, for the audit during <br />normal business hours. The Contractor, Subcontractors, or lower tier subcontractors <br />shall make a good faith effort to cooperate with the auditors. If an audit is to be <br />commenced more than 60 calendar days after the Final Acceptance date of the Contract, <br />the Contractor will be given 20 calendar days’ notice of the time when the audit is to <br />begin. If any litigation, claim, or audit arising out of, in connection with, or related to this <br />Contract is initiated, the Project records shall be retained until the later of (a) completion <br />of litigation, claim, or audit or (b) six years after the date of Final Acceptance. <br />1-09.12(2) Claims <br />All Contract Claims filed against the City shall be subject to audit at any time following <br />the filing of the Contract Claim. Failure of the Contractor, Subcontractors, or lower tier <br />subcontractors to maintain and retain sufficient records to allow the auditors to verify all
The URL can be used to link to this page
Your browser does not support the video tag.