My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division P – PROPOSAL August 2023 <br />Work Order No. – UP3745 SP – 14 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price and <br />the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All entries must be <br />typed or entered in ink. <br />BID SCHEDULE <br /> BIDDER:___________________________ <br /> <br />Item <br />No. ITEM DESCRIPTION Unit Bid <br />Qty UNIT PRICE TOTAL AMOUNT <br />1 Mobilization LS 1 $_______.___ $______________.___ <br />2 Surveying LS 1 $_______.___ $______________.___ <br />3 Removal of Structures and Obstructions LS 1 $_______.___ $______________.___ <br />4 SPCC Plan LS 1 $_______.___ $______________.___ <br />5 Force Account/ Unexpected Conditions FA 1 $ 100,000.00 $ 100,000.00 <br />6 Traffic Control Labor HR 1300 $_______.___ $______________.___ <br />7 Maintenance & Protection of Traffic Control LS 1 $_______.___ $______________.___ <br />8 Trench Excavation Safety Systems LS 1 $_______.___ $______________.___ <br />9 Erosion/Water Pollution Control LS 1 _______.___ $______________.___ <br />10 Street Cleaning HR 150 $_______.___ $______________.___ <br />11 Saw Cutting Existing Improvements LF 1200 $_______.___ $______________.___ <br />12 Foundation Material Class A or B TON 100 $_______.___ $______________.___ <br />13 Crushed Surfacing Top Course TON 50 $_______.___ $______________.___ <br />14 Crushed Surfacing Base Course TON 506 $_______.___ $______________.___ <br />15 Gravel Borrow TON 588 $_______.___ $______________.___ <br />16 Schedule A Storm Sewer Pipe, 8 In. Dia. LF 25 $_______.___ $______________.___ <br />17 Schedule A Storm Sewer Pipe, 12 In. Dia. LF 470 $_______.___ $______________.___ <br />18 Catch Basin, Type 1 EA 3 $_______.___ $______________.___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.