My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division 5 – SURFACE TREATMENTS August 2023 <br /> <br />AND PAVEMENTS <br />WO No. – UP3745 SP - 161 <br />5-04.2(2)B Using Warm Mix Asphalt Process <br />The Contractor may elect to use additives that reduce the optimum mixing <br />temperature or serve as a compaction aid for producing HMA. Additives include <br />organic additives, chemical additives and foaming processes. The use of Additives <br />is subject to the following: <br />a. Do not use additives that reduce the mixing temperature more than allowed <br />in Section 5-04.3(6) in the production of mixtures. <br />b. Before using additives, obtain the Engineer’s approval using WSDOT Form <br />350-076 to describe the proposed additive and process. <br />5-04.3 Construction Requirements <br />5-04.3(1) Weather Limitations <br />Do not place HMA for wearing course on any Traveled Way beginning October 1st <br />through March 31st of the following year without written concurrence from the Engineer. <br />Do not place HMA on any wet surface, or when the average surface temperatures are <br />less than those specified in Table 1, or when weather conditions otherwise prevent the <br />proper handling or finishing of the HMA. <br /> <br />Table 1 - Minimum Surface Temperature for Paving <br />Compacted Thickness <br />(Feet) Wearing Course Other Courses <br />Less than 0.10 55◦F 45◦F <br />0.10 to .20 45◦F 35◦F <br />More than 0.20 35◦F 35◦F <br />5-04.3(2) Paving Under Traffic <br />Apply the requirements of this Section when the Roadway being paved is open to traffic. <br />Keep intersections open to traffic at all times, except; when paving the intersection or <br />paving across the intersection. During such time, and provided that there has been an <br />advance warning to the public, the intersection may be closed for the minimum time <br />required to place and compact the mixture. In hot weather, the Engineer may require <br />the application of water to the pavement to accelerate the finish rolling of the pavement <br />and to shorten the time required before reopening to traffic. <br />Before closing an intersection, place advance warning signs and signs marking the <br />detour or alternate route. <br />During paving operations, maintain temporary pavement markings throughout the <br />project. Install temporary pavement markings on the Roadway prior to opening to traffic. <br />Provide temporary pavement markings in accordance with Section 8-23. <br />Include all costs in connection with performing the Work in accordance with these <br />requirements, except the cost of temporary pavement markings, in the unit Contract <br />prices for the various Bid items involved in the Contract. <br />5-04.3(3) Equipment <br />5-04.3(3)A Mixing Plant <br />Provide plants used for the preparation of HMA conforming to the following <br />requirements:
The URL can be used to link to this page
Your browser does not support the video tag.