My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division 5 – SURFACE TREATMENTS August 2023 <br /> <br />AND PAVEMENTS <br />WO No. – UP3745 SP - 167 <br />5-04.3(7) Spreading and Finishing <br />Lay the mixture upon an approved surface, spread, and strike off to the established <br />grade and elevation. Provide HMA pavers complying with Section 5-04.3(3) to <br />distribute the mixture. Unless Engineer directs otherwise, provide the nominal <br />compacted layer depth to NOT exceed the following: <br /> <br />HMA Class Course Maximum <br />Compacted Layer <br />Depth (FT) <br />1 inch NA 0.35 <br />3/4 & 1/2 inch Wearing 0.30 <br />3/4 & 1/2 inch Other 0.35 <br />3/8 inch NA 0.15 <br />On areas where irregularities or unavoidable obstacles make the use of mechanical <br />spreading and finishing equipment impractical, the paving may be done with other <br />equipment or by hand. <br />When more than one JMF is being utilized to produce HMA, place the material <br />produced for each JMF using separate spreading and compacting equipment. Do <br />NOT intermingle HMA produced from more than one JMF. During a work shift place <br />each strip of HMA to a single JMF established for the class of HMA specified, unless <br />there is a need to make an adjustment in the JMF. <br />5-04.3(8) Aggregate Acceptance Prior to Incorporation in HMA <br />For HMA accepted by nonstatistical evaluation the aggregate properties of sand <br />equivalent, uncompacted void content and fracture will be evaluated in accordance <br />with Section 3-04. Sampling and testing of aggregates for HMA accepted by <br />commercial evaluation will be at the Engineer’s option. <br />5-04.3(9) HMA Mixture Acceptance <br />Engineer will use nonstatistical, or commercial evaluation for determining <br />acceptance of HMA. <br />Engineer will use nonstatistical evaluation for the HMA acceptance, unless Contract <br />specifies Commercial Evaluation. <br />Engineer will use Commercial evaluation for Commercial HMA and for other classes <br />of HMA in the following applications: sidewalks, road approaches, paths, trails, <br />temporary pavement, and pavement repair. Engineer will need to approve other <br />nonstructural applications of HMA accepted by commercial evaluation. Sampling <br />and testing of HMA accepted by commercial evaluation will be at the Engineer’s <br />option. <br />The mix design will be the initial JMF for the class of HMA. The Contractor may <br />request a change in the JMF. Any adjustments to the JMF will require the Engineer’s <br />approval and may be made in accordance with this section. <br />5-04.3(9)A HMA Tolerances and Adjustments <br />1. Job Mix Formula Tolerances – Provide mixture at the time of <br />acceptance within the following tolerances: <br />For Asphalt Binder and Air Voids (Va), the acceptance limits are determined by <br />adding the tolerances below to the approved JMF values. These values will
The URL can be used to link to this page
Your browser does not support the video tag.