My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision P – PROPOSAL August 2023 <br />Work Order No. – UP3745 SP – 17 <br /> <br />SUBCONTRACTORS FORM <br />1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical <br />work (as defined by RCW Chap. 19.28), and structural steel installation and rebar installation, Bidder <br />MUST either identify itself or Subcontractors in the chart below. If Bidder believes such work is not <br />part of the scope of Work, Bidder shall write “NO WORK”. <br />2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br />Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br />will be used for which alternate. <br />3. Bidder’s bid shall be deemed nonresponsive and void if: <br />A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel installation and <br />rebar installation, Bidder fails (1) to submit as part of the Bid the names of such Subcontractors, <br />(2) to name itself to perform such Work, or (3) to write “No Work”; or <br />B. Bidder names two or more Subcontractors to perform the same work. <br />4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br />electrical, structural steel installation and rebar installation subcontractors applies only to proposed <br />heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar <br />installation subcontractors who will contract directly with the general contractor submitting the Bid to <br />the City. <br />5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart below must be <br />submitted with the bid proposal or within one hour of the published bid submittal time. <br />6. The structural steel installation and rebar installation portions of the chart below must be submitted <br />with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> <br />Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br />HEATING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />VENTILATION AND AIR CONDITIONING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />PLUMBING (as described in RCW Chap. 18.106) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />ELECTRICAL (as described in RCW Chap. <br />19.28) <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />STRUCTURAL STEEL INSTALLATION <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />REBAR INSTALLATION <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.