My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division 7 – STORM, SEWER, WATER August 2023 <br />WO No. - UPUP3745 SP – 186 <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-04.5 Payment <br />Delete all paragraphs in 7-04.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be <br />as described in Division B – Bid Item Descriptions of these Special Provisions and <br />Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />7-05 MANHOLES, INLETS, AND CATCH BASINS <br />7-05.1 Description <br />Revise the first paragraph in 7-05.1 to read as follows: <br />This Work consists of constructing manholes, inlets, drywells, and catch basins and <br />connecting to existing Structures of the types and sizes designated in accordance with <br />the Plans, these Special Provisions, the Specifications, and the COE Standard <br />Drawings, in conformity with the lines and grades staked. <br />Further supplement 7-05.1 as follows: <br />7-05.1(1) Submittals <br />(******) <br />Provide Type 2 Working Drawings for all materials and Standard Plans. <br />7-05.2 Materials <br />Supplement 7-05.2 by adding the following at the end of the material list: <br />Mortar, nonshrink 9-20.3(2) Standard Specifications <br />Commercial Concrete 6-02.3(2)B Standard Specifications <br />Watertight Connection Boots 9-05.30 Special Provisions <br />Flexible Couplings 9-05.40 Special Provisions <br />Polypropylene Manhole Steps 9-05.64 Special Provisions <br />& Hand Holds <br />Polypropylene Manhole Ladder 9-05.66 Special Provisions <br />7-05.3 Construction Requirements <br />Supplement 7-05.3 by adding the following after the last sentence of the third paragraph: <br />Install PAMREX, East Jordan Iron Works, or equal, hinged manhole frame and cover in <br />accordance with manufacturer recommendations and applicable City standards and <br />details. <br />Coordinate manhole cover and frame hinge location with manhole steps and traffic <br />lanes. Hinge orientation to be determined during the shop drawing review of precast <br />manhole structures. <br />Delete the tenth paragraph in 7-05.3. <br />Revise the eleventh paragraph in 7-05.3 to read as follows: <br />Provide Kor-N-Seal, or equal, watertight flexible pipe to manhole connectors for pipes <br />up to 48-inch diameter connecting to new sanitary sewer manholes. Place no pipe joint <br />in PVC or HDPE pipe within 10-feet of the outside face of the manhole. <br />Revise the last sentence in the sixteenth paragraph in 7-05.3 to read as follows: <br />Provide manholes, inlets, and catch basins that upon final acceptance of the Work <br />conforms to the following COE Standard Drawings requirements: <br />1. Manholes No. 605A, 605B and 605C as applicable. <br />2. Inlets No. 401 <br />3. Catch Basins No. 402, 403 and 404 as applicable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.