Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality Retrofit Division 7 – STORM, SEWER, WATER August 2023 <br />WO No. - UPUP3745 SP – 196 <br />performance. Contractor to coordinate with the Engineer for any modifications <br />resulting from the product substitution. <br /> <br />Provide operations and maintenance manuals or instructions for each proprietary <br />device installed. The document(s) shall include recommended maintenance <br />procedures, frequencies, inspection instructions and checklists, conditions which <br />trigger maintenance, and replacement material information. <br /> <br />7-06.4 Measurement <br />Bid items of Work completed pursuant to the Contract Documents will be <br />measured as described in Division B – Bid Item Descriptions of these Special <br />Provisions and Section 1-09 MEASUREMENT AND PAYMENT of the Standard <br />Specifications. <br /> <br />7-06.5 Payment <br />Payment for bid items of Work completed pursuant to the Contract Documents <br />will be as described in Division B – Bid Item Descriptions of these Special <br />Provisions and Section 1-09 MEASUREMENT AND PAYMENT of the Standard <br />Specifications. <br /> <br /> <br />7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br />7-08.1 Description <br />Further supplement 7-08.1 as follows: <br />7-08.1(1) Submittals <br />(******) <br />Provide Type 2 Working Drawings for all materials and Standard Plans. <br />Provide Type 3E Working Drawings for dewatering plans, if any. <br />7-08.2 Materials <br />Delete material items listed in 7-08.2 and substitute the following: <br />Provide materials meeting the following requirements: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />Gravel Borrow 9-03.14(1) Standard Specifications <br />Controlled Density Fill 2-09.3(1)E Special Provisions <br />Crushed Surfacing Base Course 9-03.9(3) Standard Specifications <br />7-08.3 Construction Requirements <br />7-08.3(1) Excavation and Preparation of Trench <br />7-08.3(1)A Trenches <br />Revise the second paragraph in 7-08.3(1)A and to read as follows: <br />Excavate trench in accordance with COE Standard Drawing No 614. <br />Delete the second sentence in the third paragraph in 7-08.3(1)A and substitute the <br />following: <br />Contractor may excavate above the top of the pipe zone only as wide as <br />necessary to meet OSHA requirements. <br />7-08.3(1)C Bedding the Pipe <br />Delete the second and third paragraphs in 7-08.3(1)C and substitute the following: