My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sample 10/4/2023
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Sample 10/4/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2023 11:17:38 AM
Creation date
10/4/2023 10:58:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sample
Approval Date
10/4/2023
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Test
Tracking Number
0003969
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />Beverly Lake Water Quality RetrofitDivision B – BID DESCRIPTIONS August 2023 <br />WO No. – UP3745 SP - 25 <br /> <br />The lump sum also includes, but is not limited to, all costs associated with furnishing all labor, <br />tools, survey instruments, materials and other equipment necessary for obtaining the “as <br />constructed” location and elevations of the Work, in particular, sewer pipe invert elevations <br />and other information necessary for production of the Record Drawing (As-Constructed) <br />documents meeting the requirements defined in RECORD DRAWINGS of these Special <br />Provisions. <br /> <br />Partial payments will be made for the lump sum contract price for “Surveying” as follows: <br />(e) When 10% of the total original contract amount is earned from other bid items, <br />50% of the amount bid for surveying will be paid. <br />(f) When redlines are received for preparing RECORD DRAWINGS, including all <br />information described above, 100% of the amount bid for surveying will be paid. <br /> <br />Bid Item 3 - Removal of Structures and Obstructions <br />Measurement and Payment: Lump Sum (LS) <br /> <br />The lump sum bid for Removal of Structures and Obstructions includes all costs associated <br />with complying with the requirements of Section 2-02 and 8-05. Payment for this lump sum <br />item includes, but is not limited to: <br /> <br />1. Removal and replacement of the existing condominium sign at 423 75th St SE <br />2. Remove or abandon existing storm drainage pipe or structures. <br />3. Removal of existing street trees. <br /> <br /> <br />If pavements, sidewalks, curbs, or gutters lie within an excavation area, their removal will be <br />paid for as part of the quantity removed in excavation. <br /> <br /> <br />Bid Item 4 - SPCC Plan <br />Measurement and Payment: Lump Sum (LS) <br />The lump sum bid for the Spill Prevention, Control and Countermeasures (SPCC) Plan <br />includes, but is not limited to, all costs associated with complying with the requirements of <br />Section 1-07.15(1) of the Standard Specification. <br />Bid Item 5 - Force Account/Unexpected Conditions <br />Measurement and Payment: Force Account (FA) <br />This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br />ACCOUNT; except, as modified below. <br />The Force Account bid item has been included for specific miscellaneous work items listed <br />below and for any additional work directed by the Engineer that is not required by the original <br />Contract and to address changed conditions or unanticipated work. The amount indicated in <br />the Proposal for this bid item is to provide a common bid amount. The actual amount paid <br />under this bid item may vary from no payment to the full amount of the bid item. Work <br />performed under this bid item will be initiated with a work directive issued by the Engineer,
The URL can be used to link to this page
Your browser does not support the video tag.