Laserfiche WebLink
mim <br /> BOLDING PERMIT APPLICA•N <br /> CITY OF EVERETT PERMIT SERVICES <br /> EVERETT <br /> SUBMITTAL INSTRUCTIONS: See applicable submittal checklist for submittal requirements and number of copies required for review, <br /> WASHINGTON then drop off completed application plus all required submittal documents to 3200 Cedar Street 2nd Floor Intake Drop Box. <br /> CONTACT INFORMATION: (P)425-257-8810 I (E)PermitServices@everettwa.gov I (W)everettwa.gov/permits <br /> (Blue,or Black Ink Only Please) PROJECT SITE INFORMATION <br /> PROJECT SITE ADDRESS: STREET 1415 75th St SW PARCEL#: 28041100101000 <br /> clTv Everett STATE WA ZIP 98203 <br /> SUITE/UNIT#: FLOOR#: ADDITIONAL LOCATION INFORMATION (if applicable): <br /> TENANT/BUSINESS NAME (if non-residential):Helion Energy <br /> LEGAL DESCRIPTION for new construction: Short Plat/subdivision: Lot No.: (attach copy of long legal description) <br /> CONTACT INFORMATION <br /> OWNER NAME:Sabey Corporation <br /> OWNER MAILING ADDRESS: STREET 12201 Tukwila International Blvd. 4th Floor <br /> oily Seattle STATE WA ZIP 98168 <br /> OWNER PHONE:2O6-281-8700 OWNER EMAIL: joes@sabey.com <br /> CONTRACTOR COMPANY NAME:Newland Construction Co., Inc. <br /> WA STATE CONTRACTOR LICENSE#(REQUIRED):NEWLAC*343L0 CITY OF EVERETT BUSINESS LICENSE#(REQUIRED): 18056 <br /> CONTRACTOR ADDRESS: sTREET3300 Chesnut Street <br /> cmi' Everett STATE WA ZIP 98201 <br /> CONTRACTOR PHONE:425-259-9191 CONTRACTOR EMAIL:si@newlandcompany.com <br /> PRIMARY CONTACT: ❑ OWNER ❑CONTRACTOR ❑✓ OTHER (Please Specify) Tenant representative <br /> CONTACT NAME: CONTACT PHONE:425-495-4215 <br /> Paul Gentsch CONTACT EMAIL:paul@helionenergy.com <br /> BUILDING INFORMATION <br /> VALUATION OF WORK: $700000 ASSOCIATED LAND USE PROJECT#(if applicable): <br /> (Valuation shall include the prevailing fair market value of all labor,materials,and equipment needed to complete the work,whether actually paid or not.) <br /> EXISTING USE OF BUILDING:COMMERCIAL ALTERATIONS <br /> PROPOSED USE OF BUILDING:COMMERCIAL ALTERATIONS <br /> HEAT SOURCE: ❑Gas ❑Electric ❑✓Other <br /> BUILDING TYPE: ❑SFR ❑Townhouse Duplex ❑ADU ❑Multi Family-#Units: ❑✓Commercial ❑Accessory Structure <br /> TYPE OF PROJECT(check all that apply): New Construction Addition ❑Remodel Repair ❑✓T.I. change of Use <br /> ❑Modular Portable ❑Re-roof Exterior Alteration ❑Tank (above ground) ❑Accessory Structure <br /> ❑Fence over 7ft high ❑RackStorage ❑Pool/Hot Tub ❑Tank (above ground) ❑Other: <br /> DESCRIPTION OF WORK:NEW CONTROL ROOM TI WITHIN EXTG WAREHOUSE <br /> NEW CONTROL ROOM TI WITHIN EXTG WAREHOUSE 10/30/2022: TI ADDITION <br /> OTO EXISTING WAREHOUSE, 698 SO FT NEW CONTROL <br /> ACKNOWLEDGEMENT:I have reviewed this application and confirm the information contained herein is true and correct. Work done pursuant to this permit must comply with <br /> current federal,state,and local law. The granting of a permit only authorizes approved work and no deviations therefrom.Deviations must first be authorized in writing from the <br /> Building Official before being authorized under any circumstance.I am the owner,or I am authorized by the owner of this property to perform the work for which application is made, <br /> and I comply with the State Contractors Law 18.27 RCW and 296.200A WAC. <br /> City of Everett Official Use Only <br /> Digitally signed by Paul Gentsch <br /> Paul Gentsch DN:C=US,E pgayeI helionenergy.com, PERMIT# <br /> O=Helion Energy,CN=Paul Gentsch 4/13/2023 i '% L (� <br /> Date:2023.04.14 08:41:41-07'00' (� <br /> Owner/Authorized Agent Signature Date (Revised 4/21/2022) <br />