My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Goldfinch Brothers, Inc. 10/9/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
Goldfinch Brothers, Inc. 10/9/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 9:39:50 AM
Creation date
10/10/2023 9:39:10 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Goldfinch Brothers, Inc.
Approval Date
10/9/2023
End Date
2/16/2024
Department
Procurement
Department Project Manager
Jenny Chang
Subject / Project Title
Everett Municipal Building Window Replacement
Tracking Number
0003976
Total Compensation
$9,866.79
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />The Contractor must obtain the City of Everett’s written consent prior to entering into any subcontract under <br />this contract. <br />2.7 TECHNICAL SUBMITTALS <br />To ensure that the specified products are furnished and installed in accordance with the design intent, <br />Contractor must submit the shop drawings of glass that include dimensions and finish. <br />2.8 MATERIALS AND EQUIPMENT TO BE FURNISHED <br />The Contractor must furnish all labor, tools, equipment, materials, supplies, and any other item(s) necessary to <br />successfully complete the project as specified. <br />2.9 LOCATION OF WORK <br />All work will be performed on the south side of the Everett Municipal Building, 2930 Wetmore Avenue, Everett, <br />WA 98201. <br />2.10 WORK HOURS <br />All work under the contract will be performed during normal working hours, Monday – Friday, 8:00 am – 5:00 <br />pm, excluding weekends and holidays. The Contractor must adhere to the City’s Noise Ordinance, which may be <br />viewed at https://everettwa.gov/253/Safety. <br />2.11 SUBMITTALS <br />Prior to commencing any work on the project, the Contractor to provide a Project Timeline and Schedule to the <br />City’s Project Manager. The Contractor must adhere to the submitted scheduled start and completion dates; <br />any alteration to the schedule must be pre-approved by the City’s Project Manager. <br />2.12 MOBILIZATION <br />Mobilization, Traffic Control, Property Restoration, disposal, and all other incidental charges shall be included in the <br />contract price. <br />
The URL can be used to link to this page
Your browser does not support the video tag.