Laserfiche WebLink
<br /> <br />The Contractor must obtain the City of Everett’s written consent prior to entering into any subcontract under <br />this contract. <br />2.7 TECHNICAL SUBMITTALS <br />To ensure that the specified products are furnished and installed in accordance with the design intent, <br />Contractor must submit the shop drawings of glass that include dimensions and finish. <br />2.8 MATERIALS AND EQUIPMENT TO BE FURNISHED <br />The Contractor must furnish all labor, tools, equipment, materials, supplies, and any other item(s) necessary to <br />successfully complete the project as specified. <br />2.9 LOCATION OF WORK <br />All work will be performed on the south side of the Everett Municipal Building, 2930 Wetmore Avenue, Everett, <br />WA 98201. <br />2.10 WORK HOURS <br />All work under the contract will be performed during normal working hours, Monday – Friday, 8:00 am – 5:00 <br />pm, excluding weekends and holidays. The Contractor must adhere to the City’s Noise Ordinance, which may be <br />viewed at https://everettwa.gov/253/Safety. <br />2.11 SUBMITTALS <br />Prior to commencing any work on the project, the Contractor to provide a Project Timeline and Schedule to the <br />City’s Project Manager. The Contractor must adhere to the submitted scheduled start and completion dates; <br />any alteration to the schedule must be pre-approved by the City’s Project Manager. <br />2.12 MOBILIZATION <br />Mobilization, Traffic Control, Property Restoration, disposal, and all other incidental charges shall be included in the <br />contract price. <br />