My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1820 OAKES AVE 2023-12-08
>
Address Records
>
OAKES AVE
>
1820
>
1820 OAKES AVE 2023-12-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 1:09:25 PM
Creation date
10/10/2023 9:55:26 AM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
1820
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake & Approval Sheet (FOR PERMIT STAFF ONLY) I PERMIT# j 22 p j- <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: f'lt5G4 r Date:3/I1I 4 - <br /> Intake Comments: Intake Comments: <br /> ❑ Route to Commercial Building ❑ Attach to Project No. <br /> ❑ Route to Residential Building 0 Route to Historic Reviewer <br /> ❑ Make this a "W" Permit ,OK to Route to Other Departments <br /> Bldg/TI/Addt- m_e 0 Hold in Planning File Drawer <br /> Garage/Accessory Struct. Size /V d Zone P-Z. <br /> Number of Stories r Overlay/Agreement <br /> Basement EINo ❑Yes , Fin/Unfin Nonresidential Use <br /> Type of Construction ��� Residential Use ,�F 1- <br /> Occupancy Group �f Proposed No. of Dwelling Units: <br /> Occupancy Load Total No. of Dwelling Units: <br /> Fire Sprinklers: ❑Update Existing El New System Not Req'd Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Reason Sprinklers Required: "In Lieu" Fee: Type: Amount$ <br /> Fire Alarm: ❑Update Existing New System-EINot Req'd School Impact Fee: Total $ <br /> Reason Fire Alarm Required: Calculated: Credit: <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes LI No ❑Everett School Dist ❑Mukilteo School Dist <br /> Add'I ROW 64.55 docs required prior to final? ❑Yes EINo Additional Notes: <br /> VALUATION CALCULATION: Total $ 0i9 <br /> Approved By: Date: 3//4/ .az <br /> PUBLIC WORKS <br /> Intake OK by: Date: <br /> Intake Comments: <br /> Additional Notes: PW Worksheet <br /> sheet Needed if: <br /> ❑Sys Dev Eval ❑Traffic Mit Eval <br /> OSite Work or Drainage Proposed <br /> Approved B Date:G/O pe97 ❑Backflow Prevention for high hazard: <br /> �� ;(dental,medical,animals,mortuary,hospital, <br /> `supportive housing) <br /> FIRE DEPARTMENT ❑Route this folder for PW Review at end --- PW Review Worksheet <br /> Separate/Deferred Submittals Required: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> OFire Sprinklers ❑Fire Alarm ❑Other: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> Additional Notes: 0 This Permit is Approved by Public Works <br /> ❑ See PW Review Worksheet and associated attached items <br /> Fire Dept. Fees: 0 A Separate PW Permit is Required (Permit#: PW <br /> ❑ Review of As-Built Plans-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Minimal or No Fire Scope- NO FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> ❑ Review/ Inspection Scope-ADD FIRE FEE 0 Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Approved By: Date: 0 Public Works has no scope--- PW Not Required <br /> Additional Notes: <br /> ELECTRICAL <br /> Additional Notes: <br /> Approved By: Date: Approved By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.