My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2817 MEDORA WAY 2023-12-08
>
Address Records
>
MEDORA WAY
>
2817
>
2817 MEDORA WAY 2023-12-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2023 8:41:03 AM
Creation date
10/10/2023 1:21:52 PM
Metadata
Fields
Template:
Address Document
Street Name
MEDORA WAY
Street Number
2817
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ria <br /> Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> CORRECTION <br /> 1/27/2023 1/27/2023 BLDG 08-FRAMING KURT KECK REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 1/25/2023 11:29 AM ShuChuan Chang <br /> Contact Name:ShuChuan Chang <br /> Site Address:2817 MEDORA WAY <br /> Phone:6262269678 <br /> e-Mail:shuchuan1112@gmail.com <br /> 1.Complete plumbing and mechanical rough in inspections. <br /> 2.Reschedule for framing inspection when ready. <br /> 1/31/2023 1/31/2023 BLDG 08-FRAMING KURT KECK CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 1/29/2023 12:03 AM ShuChuan Chang <br /> Contact Name:ShuChuan Chang <br /> Site Address:2817 MEDORA WAY <br /> Phone:6262269678 <br /> e-Mail:shuchuan1112@gmail.com <br /> Re site visit with RakeebA.Master bedroom,main floor:l.Plans call for 2 x 8 floor joist 12 inches on center.2.Floor system needs to be vented if slab is <br /> not insulated minimum R 10 rigid on top of vapor barrier3.Walls in this room need to be insulated to R21 which requires 2 x 6 framing.4.Architect to <br /> provide structural plan for ceiling joists5.Provide special inspection reports for hold downs in master bedroom.B.Interior stairs:1.are not code <br /> compliant.Fix or remove.C.Post in basement supporting kitchen beam interferes with egress.Location of post not per plan.D.Complete basement fire <br /> blocking top of wall and 10'horizontally where exposed. E.Garage:1.Windows need to be infilled and insulated Note. Do not insulate until framing <br /> inspection has been approved 2.Plans call for sheer and hold downs.Hold downs,require special inspections. <br /> 2/24/2023 2/24/2023 BLDG 08-FRAMING KURT KECK APPROVAL 9am-llam <br /> Notes: <br /> 2/18/2023 5:45 PM ShuChuan Chang <br /> Contact Name:ShuChuan Chang <br /> Site Address:2817 MEDORA WAY <br /> Phone:6262269678 <br /> e-Mail:shuchuan1112@gmail.com <br /> Ok to insulate <br /> 3/7/2023 3/7/2023 BLDG 12- CORRECTION <br /> KURT KECK eTRAKiT Inspection Request <br /> INSULATION REQUIRED <br /> Notes: <br /> 2/28/2023 4:44 PM ShuChuan Chang <br /> Contact Name:ShuChuan Chang <br /> Site Address:2817 MEDORA WAY <br /> Phone:6262269678 <br /> e-Mail:shuchuan1112@gmail.com <br /> 1.Complete special inspection2.Fire block top of plumbing wall at laundry downstairs 3.Fire caulk,top plate in upstairs bathroom at penetrations4. <br /> Complete insulationReschedule for framing and insulation inspection,when ready <br /> Printed: Friday, 28 April,2023 3 of 5 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.