Laserfiche WebLink
SYSTEM SUMMARY STC (10.250 kW DC / 8.725 kW AC) <br /> STC DC: (25)41 OW= 10.250 kW <br /> STC AC: (25)349W=8.725 kW <br /> STORAGE: (4)3.84kW 5.OkWh= 15.36kW 20.OkWh <br /> • (25)REC SOLAR REC 410AA PURE ALPHA SERIES(41OW)MODULES SV✓ITCH <br /> GY <br /> • (25)ENPHASE IQ8A-72-2-US(240V)MICROINVERTERS E ME KR <br /> • (4)ENPHASE IQ BATTERY 5P(IQBATTERY-5P-1 P-NA) <br /> • (1)ENPHASE IQ SYSTEM CONTROLLER 3(SC200D111 C240US01) <br /> • 1x BRANCH OF 9 CONNECTED IN PARALLEL <br /> • 2x BRANCHES OF 8 CONNECTED IN PARALLEL CONTRACTOR:SWITCH ELECTRIC HOME <br /> ENERGY <br /> ADDRESS:16778146TH ST SE SUITE 154, <br /> MONROE,WA,USA <br /> PHONE:4253125526 <br /> CONTRACTOR LICENSE#:SWITCEL8340M <br /> ELECTRICAL LICENSE#:SWITCEL91OPK <br /> EMAIL#:solar@ myswitcheleclric.com <br /> REVISIONS <br /> DESCRIPTION DATE REV <br /> AC wire details SIGNATURE&SEAL <br /> Nominal Backfeed*1.25 Min Conductor ccConductors Expected Adjusted ampacity(ampacity x temp Conductor& EGC size Conductor Max Min EMT Min PVC Min RMC <br /> WirelD #Modules Voltage /cond. set OCPD sets /conduit max temp derate x conduit fill derate) neutral size (Cu) metal length V drop size size size <br /> MS-01 9 240 V 16.31 A 20 A 1 2 26 25 x 1.00 x 1.00=25.00 A 12 AWG(Q-Cable) 06 AWG BARE Cu 50 ft 0.92% <br /> (NOT IN CONDUIT) <br /> MS-02 8 240 V 14.50 A 20 A 1 2 26 25 x 1.00 x 1.00=25.00 A 12 AWG(Q-Cable) 06 AWG BARE Cu 50 ft 0.81 % <br /> (NOT IN CONDUIT) <br /> MCB-01 9 240 V 16.31 A 20 A 1 2 26 35 x 1.00 x 1.00=35.00 A 10 AWG THWN-2 10 AWG THWN-2 Cu 50 ft 0.55% 1/2 in 1/2 in 1/2 in <br /> MCB-02 8 240 V 14.50 A 20 A 1 2 26 35 x 1.00 x 1.00=35.00 A 10 AWG THWN-2 10 AWG THWN-2 Cu 50 ft 0.49% 1/2 in 1/2 in 1/2 in <br /> LC-01 25 240 V 45.31 A 50 A 1 2 26 50 x 1.00 x 1.00=50.00 A 08 AWG THWN-2 10 AWG THWN-2 Cu 10 ft 0.20% 3/4 in 3/4 in 3/4 in HOMEOWNER INFO <br /> Q <br /> INTERCONNECTION 120% RULE EXTREME CASE MODULE OUTPUT <br /> 0 <br /> (MAIN PANEL) (REC SOLAR REC 410AA PURE ALPHA SERIES(410 O W <br /> Isc(25°C)= 10.35A,Tisc=0.040%/oC O W W <br /> INTERCONNECTION � Q <br /> 120% RULE Isc(T)= Isc(25°C)x[1 +Tisc x(T-25°C)] > W U) <br /> NOT APPLICABLE Isc(6°C)= 10.27A, Isc(26°C)= 10.35A > > <br /> Voc(25°C)=49.00V,Tvoc=-0.240%/°C 2 Z: W <br /> NO DIRECT BACKFEED INTO PANEL Voc(T)=Voc(25°C)x[1 +Tvoc x(T-25°C)] O <br /> ROUTED THROUGH ENPOWER INSTEAD Voc(6°C)=51.23V,Voc(26°C)=48.88V Q Lj (/) N <br /> LLJ rn <br /> 00 <br /> ELECTRICAL NOTES J 'r- T_1) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL,AND LABELED FOR ITS APPLICATION. <br /> 2) ALL CONDUCTORS SHALL BE COPPER,RATED FOR 600V AND 90°C WET ENVIRONMENT. > Z) <br /> 3) WIRING,CONDUIT,AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO,AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE,HIP,OR VALLEY. O <br /> 4) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. <br /> 5) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS.CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS,SUPPORTS,FITTINGS AND ACCESSORIES TO FULFILL APPLICABLE CODES AND STANDARDS. <br /> 6) WHERE SIZES OF JUNCTION BOXES,RACEWAYS,AND CONDUITS ARE NOT SPECIFIED,THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. <br /> 7) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. APIA 00792400003200 <br /> 8) MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL,PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. EMAIL:williamkwood@gmail.com <br /> 9) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C.VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. PHONE 16025686735 <br /> 10) PV EQUIPMENT SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH NEC 690. SHEET NAME <br /> 11) EXACT LOCATION OF AUXILIARY GROUNDING TO BE DETERMINED AT TIME OF INSTALL. <br /> 12) EXISTING WIRES MUST BE REPLACED IF SMALLER THAN LISTED MINIMUM SIZES PER NEC 310.15(B)(16). WIRING <br /> 13) IQ GATEWAY BREAKER DETERMINED AT FACTORY BY MANUFACTURER(10A or 15A). <br /> 14) FOR IQ GATEWAY:USE SINGLE CT FOR PV PRODUCTION(L1 FROM ALL PV BRANCH CIRCUITS).USE SINLGE CT FOR BATTERIES(L2 FROM ALL BATTERY BRANCHES LANDING IN SYSTEM CONTROLLER).USE DOUBLE CTs FOR CONSUMPTION(L1 AND L2 ON SYSTEM CONTROLLER MAIN). CALCULATIONS <br /> 15) IQ COMBINER 5/5C REQUIRES ENPHASE HOLD DOWN KIT X-IQ-NA-HD-125A. <br /> 16) IN PRESENCE OF IQ SYSTEM CONTROLLER 3,REMOVE N-G BOND FROM MAIN SERVICE PANEL. <br /> 17) SINGLE LARGEST BREAKER,BASELINE LOAD,AND LRA OF LARGEST LOAD IN BACKUP LOAD PANEL CANNOT EXCEED STORAGE(ESS)OUTPUT CAPACITY,PER NEC 710.15. SIZE <br /> 18) IQ SYSTEM CONTROLLER 3 MAIN OUTPUT LUGS RATED FOR#6-300 KCMIL,FOR WIRES SMALLER THAN#6 REMOVE LUG AND USE AN APPROVED UL RING TERMINAL. ANSI B <br /> 19) IQ SYSTEM CONTROLLER 3 COMES WITH FACTORY-INSTALLED HOLD DOWN KIT ARM,ADDITIONAL KIT NOT REQUIRED. <br /> 20) AC DISCONNECT LOCATED WITHIN 10'OR LESS FROM UTILITY METER 11" X 17" <br /> PP SHEET NUMBER <br /> WIRING CALCULATIONS PV-5 <br /> SCALE: NTS <br />