My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GeoEngineers 10/12/2023
>
Contracts
>
6 Years Then Destroy
>
2024
>
GeoEngineers 10/12/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 10:36:11 AM
Creation date
10/13/2023 10:35:31 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
GeoEngineers
Approval Date
10/12/2023
End Date
4/30/2024
Department
Parks
Department Project Manager
Katherine Phillips
Subject / Project Title
Edgewater Park Renovation Hydrogeologic Services
Tracking Number
0003983
Total Compensation
$22,680.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3 <br />IN WITNESS WHEREOF, the City and Service Provider have executed this Agreement, <br />which includes and incorporates the above Basic Provisions, the attached General Provisions, <br />the attached scope of work (Exhibit A), and the attached method of compensation (Exhib it B). <br />CITY OF EVERETT <br />WASHINGTON <br />____________________________ <br />Cassie Franklin, Mayor <br />______________________________ <br />Date <br />GEOENGINEERS <br />Signature: ____________________________ <br />Name of Signer: Stephen Thomas <br />Signer’s Email Address: sthomas@geoengineers.com <br />Title of Signer: Associate <br />ATTEST <br />______________________________ <br />Office of the City Clerk <br />APPROVED AS TO FORM <br />OFFICE OF THE CITY ATTORNEY <br />OCTOBER 10, 2023 <br />Stephen D. Thomas <br />10/12/2023
The URL can be used to link to this page
Your browser does not support the video tag.