My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 46 <br />DIVISION 1 – GENERAL REQUIREMENTS <br />Supplement Division 1 by adding the following: <br />General Description and Location of Project <br />(******) <br />Work being performed includes furnishing all labor, materials and equipment necessary to <br />construct three water quality treatment structures, associated pretreatment devices and flow <br />control structures, and miscellaneous storm drainage pipes together with street and property <br />restoration and other such appurtenances and performing all Work as required by the <br />Contract, in accordance with the Contract Plans and Contract Provisions. <br />The Project is in Everett, Washington, and is generally located on Beverly Lane near 74th St. <br />SE and 75th St SE between Beverly Lane and Evergreen Way. <br /> <br />Partial funding of this project is being provided by the Washington State Department of <br />Ecology’s (Ecology) Stormwater Grant Program. <br /> <br />Design Engineer <br />(******) <br />Questions and inquiries about these Contract Documents should be directed in writing to the <br />attention of Erik Emerson, City Project Manager, eemerson@everettwa.gov. <br />Standard Specifications <br />(******) <br />All Work under this Contract shall be performed in accordance with the following <br />Specifications except as may be exempted or modified by other sections of these Contract <br />Documents. These Specifications are incorporated by reference, made a part of this Contract <br />and shall control and guide all activities within this Project whether referred to directly, <br />paragraph by paragraph. <br />WSDOT/APWA “2023 Standard Specifications for Road, Bridge and Municipal <br />Construction”, hereinafter referred to as the “Standard Specifications.” <br />The Standard Specifications, as modified or supplemented by these Special Provisions, all <br />of which are made a part of the Contract Documents, shall govern all of the Work. The <br />following latest edition of other specifications and standard plans shall apply to the extent to <br />which they are called out in the Contract Documents: <br />1. City of Everett “Design and Construction Standards and Specifications”, latest edition <br />as found on the Web at “http://everettwa.gov/DocumentCenter/View/243”. <br />2. “Standard Plans for Road and Bridge Construction”, as prepared by WSDOT. <br />3. “Manual on Uniform Traffic Control Devices (MUTCD).” <br />4. APWA Standards. <br />5. AWWA Standards. <br />Each Provision of these Special Provisions either supplements, modifies, or replaces the <br />comparable Standard Specification, or is a new Provision. The deletion, amendment, <br />alteration, or addition to any subsection or portion of the Standard Specifications is meant to <br />pertain only to that particular portion of the section, and in no way should it be interpreted <br />that the balance of the section does not apply. <br />Sections and subsections in the Special Provisions labeled under the headers with (******) <br />indicate City of Everett Provisions.
The URL can be used to link to this page
Your browser does not support the video tag.