My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 56 <br />1-02.10 Withdrawing, Revising, or Supplementing Proposal <br />Delete 1-02.10 and substitute with the following: <br />After submitting a physical Proposal to the City, the Bidder may withdraw, revise, or <br />supplement its Proposal if: <br />1. The Bidder submits a written request signed by an authorized person and <br />physically delivers it to the place designated for receipt of Proposals, and <br />2. The City receives the request before the time set for receipt of Bid Proposals, and <br />3. The revised or supplemented Proposal (if any) is received by the City before the <br />time set for receipt of Proposals. <br />The original physical Bid Proposal may be supplemented, or revised and resubmitted as <br />the official Proposal if the City receives it before the time set for receipt of Proposals. If <br />the Bidder does not submit a revised or supplemented package in time, then its bid shall <br />be considered withdrawn. <br />Email, fax or telephone requests to withdraw, revise, or supplement a Proposal are not <br />acceptable. <br />Resubmitted Proposals shall be in full compliance with the bidding requirements. Bid <br />deposit shall be in an amount sufficient for the Proposal as resubmitted. <br />After the scheduled time for opening Proposals, no Bidder will be permitted to withdraw <br />Bidder’s Proposal unless the award of contract is delayed for a period exceeding 45 <br />calendar days. Proposals received after the scheduled closing for opening Proposals <br />will be returned unopened to the Bidder. <br />1-02.12 Public Opening of Proposals <br />Supplement 1-02.12 by adding the following: <br />1-02.12(1) Postponement of Opening <br />(******) <br />The City reserves the right to postpone the date and time for receiving or opening of <br />Bids, or both, at any time prior to the date and time established in the Notice to Bidders. <br />Postponement notices shall be provided to Bidders in the form of addenda. <br />Supplement 1-02.12 by adding the following: <br />1-02.12(2) Video Conferencing <br />(******) <br />The City reserves the right to open and publicly read Bids by use of video-conferencing, <br />such as by Microsoft Teams, Zoom or other application. <br /> <br />1-02.13 Irregular Proposals <br />Revise item 1 and 2 of 1-02.13 to read as follows: <br />(e) 1. A Proposal will be considered irregular and will be rejected if: <br />a.. The authorized proposal form furnished by the City is not used or is altered; <br />b. The completed proposal form contains any unauthorized additions, deletions, <br />alternate Bids, or conditions; <br />c. The Bidder adds provisions reserving the right to reject or accept the Award, <br />or enter into the Contract; <br />d. A price per unit cannot be determined from the Bid Proposal; <br />e. The Proposal form is not properly executed; <br />f. The Bidder fails to submit or properly complete, on the form provided by the <br />City, the Subcontractor list, if applicable, as required in 1-02.6;
The URL can be used to link to this page
Your browser does not support the video tag.