My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 58 <br />3. A progress schedule, in a form the City requires, showing the order of and <br />time required for the various phases of the Work, <br />4. A breakdown of costs assigned to any bid item, <br />5. Attendance at a conference with the Engineer or representatives of the <br />Engineer, <br />6. Obtain, and furnish a copy of, a business license to do business in the City of <br />Everett. <br />7. A copy of State of Washington Contractor’s Registration, or <br />8. Any other information or action taken that is deemed necessary to ensure that <br />the Bidder is the lowest responsible bidder. <br /> <br />1-02.16 Grant Funding <br />Add 1-02.16 to read as follows: <br />It is anticipated that this project will be funded in part by the Washington State <br />Department of Ecology. Neither the State of Washington nor any of its departments or <br />employees are, or shall be, a party to this contract or any subcontract. <br /> <br /> <br />1-03 AWARD AND EXECUTION OF CONTRACT <br />1-03.1 Consideration of Bids <br />Revise the first paragraph to read: <br />After opening and reading Proposals, the City will check them for correctness of <br />extensions of the prices per unit and the total price. If a discrepancy exists between the <br />price per unit and the extended amount of any bid item, the price per unit will control. If <br />a minimum bid amount has been established for any item and the Bidder’s unit or lump <br />sum price is less than the minimum specified amount, the City will unilaterally revise the <br />unit or lump sum price to the minimum specified amount and recalculate the extension. <br />The total of extensions, corrected where necessary, including sales taxes where <br />applicable and such additives and/or alternates as selected by the City, will be used by <br />the City for Award purposes and to fix the awarded Contract Sum and the amount of the <br />Contract Bond(s). <br />Revise the third and fourth paragraphs of 1-03.1 to read as follows: <br />Within 5 days after the opening of Proposals (or such longer time as the City may grant <br />in writing), a Bidder who wishes to claim error shall submit a notarized affidavit signed <br />by the Bidder, accompanied by original work sheets used in the preparation of the <br />Proposal, requesting relief from the responsibilities of Award. <br />The affidavit shall describe the specific error(s) and certify that the work sheets are the <br />originals used in the preparation of the Proposal. The Engineer will review the certified <br />work sheets to determine the validity of the claimed error and make recommendation to <br />the City. If the City concurs in the claim of error, the Bidder will be relieved of <br />responsibility, and the bid deposit of the Bidder will be returned. Thereafter, at the <br />discretion of the City, all Bids may be rejected or Award made to next lowest and <br />responsive Bidder. <br />Supplement 1-03.1 by adding the following:
The URL can be used to link to this page
Your browser does not support the video tag.