My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 60 <br />the underwriting limitations for the respective surety specified in Circular 570. The bonds <br />must be signed by an officer of the Contractor empowered to sign binding instruments. <br />The bonds must be accompanied by a fully executed and original power of attorney for <br />the officer executing on behalf of the surety. The scope of the bonds or the form thereof <br />prescribed in these Contract Documents shall in no way affect or alter the liabilities of <br />the Contractor to the City as set forth in the Contract Documents. <br />1-03.5 Failure to Execute Contract <br />Supplement 1-03.5 by adding the following: <br />In addition to the items listed in the first paragraph of 1-03.5, failure to have or obtain a <br />City of Everett business license prior to executing the Contract, unless immediately <br />cured by Bidder after notice from the City, shall result in forfeiture of the proposal bond <br />or deposit of this Bidder. <br />1-03.6 Return of Bid Deposit <br />Supplement 1-03.6 by adding the following: <br />Within 15 calendar days after the Bids are opened, the City will return the bid deposit <br />accompanying the Bids that are not to be considered in making the Award. <br />1-03.7 Judicial Review <br />Revise 1-03.7 to read as follows: <br />All protests by Bidders must be in accordance with Chapter 3.46 of the Everett Municipal <br />Code, “Bid Protest Procedures.” <br />The exclusive venue of all lawsuits shall be in Snohomish County Superior Court. <br /> <br />1-03.8 Third Party Beneficiary <br />Add 1-03.8 to read as follows: <br />Partial funding of this project is being provided through the Washington State <br />Department of Ecology Stormwater Grant Program. All parties agree that the State of <br />Washington shall be, and is hereby, named as an express third-party beneficiary of this <br />contract, with full rights as such. <br /> <br /> <br />1-04 SCOPE OF THE WORK <br />1-04.1 Intent of the Contract <br />Supplement 1-04.1 by adding the following: <br />1-04.1(3) Specifications and Plans <br />(******) <br />1-04.1(3)A Interpretation of Specifications and Plans <br />The Specifications and Plans are intended to be explanatory and supportive of each <br />other. Work specified on the Plans and not in the Specifications, or vice versa, shall <br />be executed as if specified in both. In the event the Work to be done or matters <br />relative thereto are not sufficiently detailed or explained in the Contract Documents, <br />the Contractor shall immediately ask the City’s Representative for further <br />explanation and shall comply with such explanation. In the event of doubt or <br />question arising respecting the true meaning of the Specifications or Plans, <br />Contractor shall refer to the City’s Representative for its decision.
The URL can be used to link to this page
Your browser does not support the video tag.