My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 61 <br />1-04.1(3)B Division of Specifications and Plans <br />Specifications and Plans are divided into groups for convenience. These divisions <br />are not for the purpose of apportioning Work or responsibility for Work among <br />Subcontractors, Suppliers and manufacturers. The Contractor is responsible for all <br />Work shown or described, regardless of location(s) in the Contract Documents. <br />1-04.1(3)C Discrepancies in Specifications and Plans <br />1-04.1(3)C(1) Errors and Omissions <br />If the Contractor becomes aware of any errors or omissions in the Contract <br />Documents or in the City's field work, it shall immediately inform the City’s <br />Representative in writing. The City’s Representative will promptly review the <br />matter and if it finds an error or omission has been made; it will determine the <br />corrective actions and advise the Contractor accordingly. If the corrective work <br />associated with an error or omission increases or decreases the amount of <br />Work called for in the Contract, the City will issue an appropriate Change Order. <br />After discovery by the Contractor of an error or omission, related Work <br />performed by the Contractor shall be done at its risk unless authorized by the <br />City’s Representative and approved by the City. <br />1-04.1(3)C(2) Conflicting Provisions <br />In the event an item of Work is described differently in two or more locations on <br />the Plans, in the Specifications and Special Provisions, the Contractor shall, <br />upon request of the City’s Representative, submit in writing to the City’s <br />Representative the description upon which the Contractor relied in preparing <br />its Bid or laying out the Work. <br />1-04.1(3)D Utilities <br />1-04.1(3)D(1) General <br />The City has endeavored to determine the existence of public and private <br />utilities at the site of the Work from the records of the owners of known utilities <br />in the vicinity of the Work. The positions of these utilities as derived from such <br />records are shown on the Plans. Unless otherwise noted, no excavations were <br />made to verify the locations shown for underground utilities. The service <br />connections to the gas, electric, cable TV and communication utilities are not <br />shown on the Plans. Refer to 1-07.17 UTILITIES AND SIMILAR FACILITIES <br />regarding Contractor’s responsibility for locating and verifying underground <br />public and private utilities. <br />1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities <br />When a utility interferes with the Work and is either (1) not identified on the <br />Plans or (2) located in a position significantly different from that specified on <br />the Plans or in accordance with a particular utility’s standard depth and location, <br />Contractor shall follow the procedures of 1-04.7 DIFFERING SITE <br />CONDITIONS (CHANGED CONDITIONS). Interference with the Work is <br />defined as a utility that crosses or projects into the plane of the Work at an <br />elevation between the top and bottom of the Work. <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br />Specifications, and Addenda <br />Revise the first and second paragraphs of 1-04.2 to read as follows: <br />The complete Contract includes Division C – CONTRACT, Division P - PROPOSAL, <br />Division B – BID ITEM DESCRIPTIONS, Special Provisions, Contract Plans, Standard <br />Specifications, Standard Plans in effect as of the date Bids are opened, Addenda,
The URL can be used to link to this page
Your browser does not support the video tag.