R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 62 <br />supplemental agreements, change orders, certifications and affidavits required by this <br />Contract and by law, and Federal requirements that apply to this Contract and Project. <br />These parts complement each other in describing a complete Work. Any requirement in <br />one part binds as if stated in all parts. The Contractor shall provide any Work or materials <br />clearly implied in the Contract even if the Contract does not mention it specifically. <br /> <br />Any inconsistency in the parts of the Contract shall be resolved by following this order <br />of precedence: <br />1. Change Orders, <br />2. Addenda, <br />3. Division C – CONTRACT, <br />4. Division P - PROPOSAL, <br />5. Division B – BID ITEM DESCRIPTIONS <br />6. Special Provisions, <br />7. Contract Plans, <br />8. City’s Standard Drawings (if any) <br />9. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br />Construction, 2023 <br />10. WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br />Revise the seventh paragraph of 1.04.2 to read as follows: <br />In case of any ambiguity or dispute over interpreting the Contract, the Engineer’s <br />decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br />1-04.3 Reference Information <br />Revise 1-04.3 to read as follows: <br />Reference Information provided to the Contractor is not part of the Contract. The City of <br />Everett does not guarantee the accuracy of the Reference Information and is not <br />responsible for the content of the Reference Information in any manner. Any use of <br />Reference Information by the Contractor is done solely at the Contractor’s risk. <br />1-04.4 Changes <br />Delete 1-04.4 and substitute the following: <br />1-04.4 Changes <br />1-04.4(1) City’s Right to Direct Changes to the Work <br />(******) <br />The City reserves the right to change the Work at any time. Such changes shall not <br />invalidate the Contract nor release the Surety, and the Contractor agrees to perform the <br />Work as changed. Among others, these changes and alterations may include: <br />1. Deleting or omitting any part of the Work, Equipment or material to be <br />provided under this Contract, <br />2. Increasing or decreasing quantities, <br />3. Altering Specifications, designs, or both, <br />4. Altering the way the Work is to be done, <br />5. Adding new Work or Extra Work, <br />6. Altering facilities, Equipment, materials, services, or sites, provided by the <br />City, and <br />7. Ordering the Contractor to accelerate or Delay the Work.