R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 65 <br />Irrespective of any request for additional compensation or Contract Time or a Contract <br />Claim that Work is extra and not part of the original scope of Work, the Contractor shall <br />proceed expeditiously and promptly with the Work as the City orders. <br />If the Contractor fails to follow the procedures of this Contract, including failing to give <br />Notice, the Contractor completely waives any Contract Claims. In its sole discretion, the <br />City may waive strict compliance with procedures, but any such waiver of one or more <br />items or elements does not waive the necessity for Contractor’s strict compliance with <br />any other item or element, nor shall such waiver be admissible in any legal proceeding <br />for any reason. <br />1-04.5(2) Form of Notice <br />The Notice shall be in writing and include the following minimum information: <br />1. A complete and accurate description of the event(s) giving rise to the Notice, <br />including dates, times, and locations; <br />2. A preliminary list of persons involved in such event; <br />3. A statement whether the Contractor believes the event may result in a <br />Contract Claim for additional Contract Time or adjustment of the Contract <br />Sum; <br />4. A date by which Contractor shall begin providing Supplemental Information as <br />provided in this section. <br />1-04.5(3) Supplemental Information <br />Contractor shall supplement the written Notice as soon as possible with a written <br />statement providing the following: <br />1. The date of the event, incident, direction, instruction, interpretation or <br />determination; <br />2. The nature and circumstances giving rise to the Notice; <br />3. The contract provisions relating to the event, incident, direction, instruction, <br />interpretation or determination; <br />4. The estimated dollar cost, if any, of the Extra Work, Delay, change or <br />disruption and detailing how the dollar amount estimate was determined; and <br />5. An analysis of the progress schedule showing the impact to the schedule <br />resulting from the change or disruption, if the Contractor is asserting a <br />schedule change or disruption; <br />Throughout any work related to a Notice, the Contractor shall keep complete and <br />accurate records of costs, expenses, and time incurred for which Contractor will or may <br />seek an adjustment. Contractor waives and is estopped from seeking an adjustment of <br />Contract Sum or Contract Time where Contractor fails to keep and maintain cost, <br />timekeeping, and scheduling records segregated and contemporaneously allocated to <br />the subject work for which an adjustment is sought. For example, failure to keep <br />contemporaneous labor and equipment time records specifically and only allocated to <br />each item of claimed Extra Work shall constitute a waiver of any Contract Claim for <br />reimbursement or additional Contract Time for each such item of Extra Work. The <br />Contractor shall permit the City access to these and any other records needed for <br />evaluating requests for additional Contract Time or Contract Sum. <br />1-04.5(4) Contract Claim <br />A Contractor dissatisfied with the City’s response or (non-response) to a Notice provided <br />under Section 1-04.5 completely waives any claims related to such Notice unless the <br />Contractor submits a Contract Claim in accordance with Section 1-09.11.