My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 71 <br />7-02 Culverts <br />7-02.2 Materials-Catalog Cuts or Standard Plans <br />7-03 Structural Plate Pipe, Pipe Arch, Arch and Underpass <br />7-03.2 Materials-Catalog Cuts or Standard Plans <br />7-04 Storm Sewers <br />7-04.2 Materials-Catalog Cuts or Standard Plans <br />7-05 Manholes, Inlets, Catch Basins, and Drywells <br />7-05.2 Materials-Catalog Cuts or Standard Plans <br />7-06 Water Quality Treatment Structures <br />7-06.3(1) Submittals <br />7-09 Water Mains <br />7-09.2 Materials-Catalog Cuts or Standard Plans <br />7-12 Valves For Water Mains <br />7-12.2 Materials-Catalog Cuts or Standard Plans <br />7-14 Hydrants <br />7-14.2 Materials-Catalog Cuts or Standard Plans <br />7-15 Service Connections <br />7-15.2 Materials-Catalog Cuts or Standard Plans <br />7-17 Sanitary Sewers <br />7-17.2 Materials-Catalog Cuts or Standard Plans <br />DIVISION 8 MISCELLANEOUS CONSTRUCTION <br />8-11 Guardrail <br />8-11.2 Materials-Catalog Cuts or Standard Plans <br />8-12 Chain Link Fence and Wire Fence <br />8-12.2 Materials-Catalog Cuts or Standard Plans <br />8-13 Monument Cases <br />8-13.2 Materials-Standard Plans <br />8-27 Pedestrian Guard (New Section) <br />8-27.1(1) Ornamental Hand Rail-Shop Drawings <br />8-27.1(2) Pedestrian Hand Rail (Galvanized Steel and Aluminum)-Shop <br />Drawings <br />Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br />Contractor and approved by the Engineer. Where a Working Drawing is required by the <br />Specifications, related Work performed prior to completion of the Engineer's review of <br />the pertinent submission will be the sole expense and responsibility of the Contractor. <br />Supplement 1-05.3 by adding the following: <br />1-05.3(1) Submittals <br />(******) <br />Where required by the Contract Documents, the Contractor shall submit information, <br />such as Working Drawings that will enable the City’s Representative to advise the City <br />whether the Contractor's proposed materials, Equipment or methods of work are in <br />general conformance to the design concept and in compliance with the Plans and <br />Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br />complying with Contract requirements. The City’s approval of a Submittal does not
The URL can be used to link to this page
Your browser does not support the video tag.