My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 78 <br />tier subcontractors, to pay all laborers, mechanics, Subcontractors, material persons, or <br />any other person who provides labor, supplies, or provisions for carrying out the Work <br />or for any payments required for unemployment compensation under Title 50 RCW or <br />for industrial insurance and medical aid required under Title 51 RCW. <br />Failure of the Contractor to perform all of the Contractor's obligations under the Contract <br />shall not bar the City from unilaterally certifying the Contract complete so the Engineer <br />may calculate a final contract price as provided in 1-09.9 PAYMENTS. <br />1-05.13 Superintendents, Labor and Equipment of Contractor <br />Delete 1-05.13. <br />1-05.14 Cooperation With Other Contractors <br />Delete all of 1-05.14 and substitute the following: <br />Nothing in the Contract shall be interpreted as granting to the Contractor exclusive <br />occupancy of the Project area. The Contractor shall ascertain to its own satisfaction the <br />scope of the Project and the nature of any other contracts that have been or may be <br />awarded by the City in the construction of the Project, or to the end that the Contractor <br />may perform this Contract in the light of such other contracts, if any. <br />The Contractor shall not cause unnecessary hindrance or Delay to others working on <br />this or other projects. If the performance of a contract for the Project is likely to be <br />interfered with by the simultaneous performance of some other contract or contracts, the <br />Engineer will decide which Contractor shall cease Work temporarily and which <br />Contractor shall continue, or whether the Work under the contracts can be coordinated <br />so that the contractors may proceed simultaneously. On all questions concerning <br />conflicting interest of contractors performing related Work, the decision of the Engineer <br />shall be binding upon all contractors concerned and the City, the Engineer, the City's <br />Representative, and their consultants shall not be responsible for any damages suffered <br />or extra costs incurred by the Contractor resulting directly or indirectly from the Award or <br />performance or attempted performance of any other contract or contracts on the Project <br />or caused by a decision or omission of the Engineer respecting the order of precedence <br />in the performance of the contracts. <br />If, through acts of neglect on the part of the Contractor, any others suffer loss or damage <br />on the Work, the Contractor agrees to resolve such loss or damage fairly and <br />expeditiously. If such other shall assert any claim against the City, the Engineer, the <br />City's Representative, or their consultants on account of any damage alleged to have <br />been so sustained, the City shall notify the Contractor, who shall hold harmless, <br />indemnify, and defend the City, Engineer, the City's Representative, and their <br />consultants, and each of their directors, officers, employees, and agents against any <br />such claim, including all attorney's fees and any other costs incurred by the indemnified <br />parties relative to any such claim. <br />The Contractor shall coordinate its work with other contractors and utility companies that <br />may have facilities in the Project area and cooperate with them. The Contractor shall <br />also coordinate its activities with the City; and no water mains, individual water services, <br />street, or private driveways may be closed off without a minimum of five working days <br />notice to the City and the private property owner. Should the property owner or the City <br />have adequate reason, as determined by the Engineer, to avoid access or water service <br />shutoff at the scheduled time, the Contractor shall reschedule its work to meet the new <br />condition. <br />Final grading to subgrade and subgrade preparation in those areas disturbed by the <br />utilities companies shall be the responsibility of the Contractor and included in the street <br />construction and no additional compensation will be paid.
The URL can be used to link to this page
Your browser does not support the video tag.