My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 81 <br />1-05.18(2) Construction Procedures <br />The Contractor shall supervise and direct the Work and determine the means, methods, <br />techniques, sequences and procedures of construction, except in those instances where <br />the City, to define the quality of an item of Work, specifies in the Contract a means, <br />method, technique, sequence or procedure for construction of that item of Work. The <br />Contractor shall execute Work in conformity with the standard practice of the trade. <br />1-05.18(3) Responsibilities <br />1-05.18(3)A Manufacturers and Suppliers <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br />manufacturers, Suppliers and their employees. <br />1-05.18(3)B Contractor's Employees <br />The Contractor shall be responsible for the adequacy, efficiency and sufficiency of <br />its employees. Workers shall have sufficient knowledge, skill and experience to <br />perform properly the Work assigned to them. <br />1-05.18(3)C Payment for Labor and Materials <br />The Contractor shall pay and require its Subcontractors to pay any and all accounts <br />for labor including Worker's Compensation premiums, State Unemployment and <br />Federal Social Security payments and other wage and salary deductions required <br />by law. The Contractor also shall pay and cause its Subcontractors to pay any and <br />all accounts for services, equipment, and materials used by him and its <br />Subcontractors during the performance of Work under this Contract. The <br />Contractor shall pay such accounts as they become due and payable. If requested <br />by the City, the Contractor shall promptly furnish proof of payment of such accounts <br />to the City. <br />1-05.18(3)D Attention to Work <br />The Contractor, either in person or acting through its representative, shall give <br />personal attention to and shall manage the Work so that it shall be prosecuted <br />faithfully and completed under the Project schedule. When its representative is not <br />personally present at the Project site, its designated alternate shall be available and <br />shall have the authority to act in matters relating to this Contract. <br />Where detailed construction requirements are not set forth in the Standard <br />Specifications or these Special Provisions, the Contractor shall perform the Work of <br />a quality comparable to the workmanship specified for other parts of the Work, from <br />firms having established good reputations for similar Work, or by following industry <br />standard practices. The Contractor shall perform all Work in compliance with and <br />conforming to applicable building codes in effect at the time the Work is being <br />performed. <br />1-05.18(3)E Safety <br />The Contractor alone shall be responsible for safety on the job site, including, but <br />not limited to, the safety of its and its Subcontractor's employees. The Contractor <br />shall maintain the Project site and perform the Work in a manner that meets the <br />City's responsibility under statutory and common law for the provision of a safe <br />place to work. <br />1-05.18(3)F Threats, Intimidation and Harassment Forbidden <br />Contractor shall not allow its employees, its Subcontractors, its Subcontractors’ <br />employees, or any other agents to threaten bodily injury or property damage, to <br />intimidate or attempt to intimidate any person, or to assault or physically harass any <br />person. Forbidden conduct includes, but is not limited to, threatening, appearing,
The URL can be used to link to this page
Your browser does not support the video tag.