R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 85 <br />1-06.2 Acceptance of Materials <br />1-06.2(2)B Financial Incentive <br />Delete 1-06.2(2)B. <br />1-06.2(2)D Quality Level Analysis <br />Delete 1-06.2(2)D. <br />1-06.3 Manufacturer’s Certificate of Compliance <br />Supplement 1-06.3 by adding the following: <br />When authorized by the Standard Specifications or these Special Provisions and prior <br />to use, the Engineer may accept certain Equipment on the basis of a Manufacturer’s <br />Certificate of Compliance as an alternate to Equipment inspection and testing. <br />A Manufacturer’s Certificate of Compliance shall be reserved for cases where <br />compliance to Contract requirements is not readily determinable through inspection and <br />testing of materials or Equipment. The Contractor shall provide properly authenticated <br />documents to the City’s Representative that the materials and Equipment comply with <br />the Contract requirements. <br />The Contractor shall pay all associated costs of providing each Manufacturer’s <br />Certificate of Compliance submitted for City acceptance. <br />The City reserves the right to refuse to accept Equipment on the basis of a <br />Manufacturer’s Certificate of Compliance. <br />1-06.3(1) Inspection at Point of Manufacturing <br />(******) <br />The Contractor shall be responsible to reimburse the City for the costs of inspections at <br />the point of manufacturing for inspections occurring outside of Whatcom, Skagit, Island, <br />Snohomish, King, Pierce and Thurston counties. Costs to be paid or reimbursed by the <br />Contractor include, but are not limited to, travel, subsistence, labor and lodging <br />expenses of the City Inspector. <br />Point of manufacturing inspection will be required if: <br />Inspection and testing of materials or Equipment in the vicinity of the Work by the <br />City is not practicable, <br />The Contractor requests the City to inspect and test material or Equipment at the <br />point of manufacture, or <br />The Standard Specifications or these Special Provisions require that inspection, <br />testing or witnessing of tests take place at the point of manufacture. <br />1-06.4 Handling and Storing Materials <br />Supplement 1-06.4 by adding the following: <br />Contractor shall store materials and Equipment so as to insure the preservation of their <br />quality and fitness for the Work. Contractor shall store Equipment and materials at <br />location that facilitates inspection. The Contractor shall be responsible for damages, <br />loss or casualty occurring to materials and Equipment until Final Acceptance. <br />1-06.6 Recycled Materials <br />Delete 1-06.6 and its subsections and substitute the following: <br />The Contractor shall make best effort to utilize recycled materials in the construction of <br />the project as detailed in elsewhere in the Standard Specifications and these Special <br />Provisions. <br />Prior to Physical Completion Contractor shall report the quantity of recycled materials <br />utilized in the construction of the project for each of the items listed in Section 9-03.21.