My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.L. Alia Company 10/17/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
R.L. Alia Company 10/17/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2023 10:29:29 AM
Creation date
10/17/2023 9:12:24 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
R.L. Alia Company
Approval Date
10/17/2023
Council Approval Date
10/4/2023
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Retrofit
Tracking Number
0003987
Total Compensation
$1,175,015.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
R.L. Alia Company 10/30/2023
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
R.L. Alia Company 10/30/2023 (2)
(Attachment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />Beverly Lake Water Quality Retrofit Division 1 – GENERAL REQUIREMENTS August 2023 <br />WO No – UP3745 SP – 87 <br />If the scope of Work in this Contract includes Work at the City of Everett Water Filtration <br />Plant or the Waste Water Pollution Control Facility, Contractor shall comply with the <br />requirements of the Washington Department of Labor & Industries for such work <br />including, but not limited to, Chapter 296-67 WAC. All costs associated or incurred in <br />complying with these regulations or any other regulations listed above are included in <br />the Contractor’s Proposal. <br />In cases of conflict between different safety regulations, the more stringent regulation <br />shall apply. <br />The Washington State Department of Labor and Industries shall be the sole and <br />paramount administrative agency responsible for the administration of the provisions of <br />the Washington Industrial Safety and Health Act of 1973 (WISHA). <br />The Contractor shall maintain at the project site office, or other well-known place at the <br />project site, all articles necessary for providing first aid to the injured. The Contractor <br />shall establish, publish, and make known to all employees, procedures for ensuring <br />immediate removal to a hospital, or doctor’s care, persons, including employees, who <br />may have been injured on the project site. Employees should not be permitted to work <br />on the project site before the Contractor has established and made known procedures <br />for removal of injured persons to a hospital or a doctor’s care. <br />The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br />the Contractor’s plant, appliances, and methods, and for any damage or injury resulting <br />from their failure, or improper maintenance, use, or operation. The Contractor shall be <br />solely and completely responsible for the conditions of the project site, including safety <br />for all persons and property in the performance of the Work. This requirement shall <br />apply continuously, and not be limited to normal working hours. The required or implied <br />duty of the Engineer to conduct construction review of the Contractor’s performance <br />does not, and shall not, be intended to include review and adequacy of the Contractor’s <br />safety measures in, on, or near the project site. <br />1-07.1(7) Noise <br />Work within 500 feet of residential properties between the hours of 10:00 p.m. and 7:00 <br />a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on weekends <br />or holidays are subject to noise control requirements if the work generates decibel levels <br />of greater than 55 db(A). <br />Appendix J contains the City of Everett’s Noise Ordinance for Bidder’s reference. <br />Approval to continue Work during these hours may be revoked at any time the Contractor <br />exceeds the City’s noise control regulations or complaints are received from the public <br />or adjoining property owners regarding the noise from the Contractor’s operation. The <br />Contractor shall have no claim for damages or delays should such permission be <br />revoked for these reasons. <br />1-07.2 State Taxes <br />Delete 1-07.2 and substitute the following: <br />1-07.2 State Sales Tax <br />The Washington State Department of Revenue has issued special rules on the State <br />sales tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The <br />Contractor should contact the Washington State Department of Revenue for answers to <br />questions in this area. The City will not adjust its payment if the Contractor bases a Bid <br />on a misunderstood tax liability.
The URL can be used to link to this page
Your browser does not support the video tag.