Laserfiche WebLink
• <br /> COMPLIANCE PATH PRESCRIPTIVE: WINQOW SCHEDULE <br /> AREA, Table 406.2 w <br /> International Residential Code 2015 NUMBER ROOM NAME WIDTH HEIGHT EGRESS DESCRIPTION STANDARD TEMPERED FLOOR m i£ <br /> (50 PT) Energy Credits (2015 Code) Z <br /> (IRC 2015) 1"101 PROPOSED BEDROOM 24" 45" FIXED GLASS 8.0 YES 2 OPTION DESCRIPTION CREDITISI Estimated Cost zit)O <br /> • W02 PROPOSED BEDROOM 12" 45" YE5 RIGHT SLIDING 24.0 2 5a EFFICIENT WATER HEATING 5a) 0.5 I- <br /> with WA State Amendments All showcrhead and kitchen sink faucets installed in the hoe a shall be rated at 1.75 w <br /> W03 PROPOSED BEDROOM 62" 48" YE5 RIGHT SLIDING 20.61 2 GPM or less.All other lavatory faucets shall he toted at 1.0 GPM or less.` Ulcc <br /> W04 FAMILY 64" 36" YES RIGHT SLIDING 16.0 1 To qualify to claim this credit,the building permit drawings shall specify the option <br /> W05 BEDROOM 42" 45" YES RIGHT SLIDING 14.0 1 being selected and shall specify the maximum flow rates for all shownrheads,kitchen <br /> 82.6 t sink faucets,and otherlavatory faucets. <br /> TOTALS: 5b EFFICIENT WATER HEATING Sb: 1.0 <br /> Water heating system shall include one of the following: <br /> Gas,propane or oil water heater with a minimum EF of 0.74 'n <br /> or <br /> /� DOOR�``WIDTH.L6E Water heater heated by ground source heat pump meeting the requirements of Option <br /> V <br /> NUMBER ROOM NAME LABEL (WIDTH (HEIGHT R/O DESCRIPTION 3e (Y <br /> D01 PROPOSED BEDROOM 3065 36" 80" 35"X53" EXT.HINGED-POOR E21 or Ix W <br /> For R-2 occupancy,a central heat pump water heater with an EF greater than 2.0 that O <br /> y would supply DHW to all the units through a central water loop insulated with R-8 <br /> Q / Q minimum pipe insulation. <br /> �/ /J E; To qualify to claim this credit the building permit drawings shall specify the option o W <br /> \ 1 11 1 11 being selected and shall specify the water hwter equipment type and the minimum <br /> 9 -8 4-11 -5�_211 I Property Add 8411 E Xavier Noy Ever WA equipment efficiency. ox <br /> 5c EFFICIENT WATER HEATING 5c: 15 U- W <br /> Conditioned Floor Area: Water heating system shall include one of following: <br /> /C• 'I B365F I1ate: 02/11 /70 BaYs f W <br /> Gas,propane or oil water heater with a minimum EF of0.91 tZ F„ <br /> or <br /> \ \ / Builder or registered design professional: Solar water heating supplementing a minimum standard water halter.Solar water w 1.❑ <br /> \ / M1mting will prosidc a rated minimum saving of 85 thertns or 2000 kWh bound on the lL <br /> KESH GHAVDA Soler Rating and CcniGstion Caryoratian(SRCC)Annual PMormernm ofOG-300 •\ Kegyv Glaavdo- Certified Solar Water Heating Systems f� <br /> Mor <br /> 1 V Electric heal pump water heater with a minimum EF of2.0 and minting the standards <br /> - \ / - ` R-1'aInes ofNEEA's Northam Climate Specifications far Hmt Pump Water Heaters I <br /> To quality to claim this c edit,the building permit drawings shall specify the option <br /> O \ /i- In Ceitiug: Vaulted R- 3B Flours: Over unconditiongtl space R- 49 being tented end shell sp ify the waterhin er equipment ype end the minimum V <br /> ryuipnwnt efficiency and,for solar water heating systems,rbe calcWation ofthe -r� <br /> BEDR/��M <br /> BATH Attic R- 49 Slab on grade floor R- 10 minimum energy saving. u' <br /> - "'`( / Sd EFFICIENT WATER HEATING 5d: 0.5 <br /> 9'-b"X 10'-1 - - 5'-1"X 9'-5' Walls: Above grade R- 21 Doors: R- A drain water heat recovery unit(s)shall be installed,which captures waste water hest <br /> Q -' item all the showers,and has a minimum efficiency of40%ifinstalled for equal flowin K <br /> 98 50 FT WALK-IN / I 48 5Q FT ti Below.int. R 21 R or a minimum efficiency of52%if installed for unequal flow.Such units shall be 0 <br /> CLOSET / toted in accordanceclaim <br /> triAB55.l and bemlabeled. <br /> I C Below.ext. R- 10 R- To qualify to claim this ledit the building permit drawings shall include a plumbing f\ <br /> \ 4'-10"X 9'-5� j ® diagram that sprained the drain water pent recovery units and me plumbing layout 66 y <br /> \ 4b 50 T I lJ 0-Faemrx and SHGC needed w install a and axis or other documentation anon be provided that Z <br /> demonstrates that the unit complies with the standard. <br /> t I 50 GFM ? NFRC rating lorl Windows U.0.2a SIICC- N/A <br /> ���'''""" \ / 1 / Dcfnult rating tAlpoaor 0 s.,.,.o Skylights U-0.90 SHC('- N/A Qi <br /> / \ / I C Table 406.2 Opriontvl 10 0 Ter Taral406.2 Credits 1.5 C <br /> / Heating.fueling.4Domes(ie Hat HolCr Table 406.2 <br /> 6'-3" ® Syxlcnt type ElTdrnq Energy Credits (2015 Code) <br /> STORAGE z llcarmng <br /> Electric Forced Nr Furnace 42%AFUE DESCRIPTION CREDITO) Estimated Cost 'a <br /> I V 2C AIR LEAKAGE CO Nmoio AND2.4.1.2:R Tdu VENTILATION t ak: 1.5 <br /> GO/ 3'-1"X 1'-0" q Comlimmg Compliance baedon Se lion R402.4.1.2 Reduce the to ed oir leakagmLS air <br /> - M4= 0 FT - H ellen.per hour ma imam tn <br /> -. DII W Electric Water Tank EF-2 cad <br /> 'Cr 42 All whole house ventilation requirements as determined by Section M1507.3 of the n <br /> L. IHALL Duct BWIAlrg.8ir Leakage International Residential Code shall be met withal t r ovary ventilation system <br /> 11'-3"X4'-3" O with minimum sensible heat recovery etiiciencyof0.85. <br /> LOSET 111dncts&HVAC in conditioned yes 1 Instil:0i.II.A To qualify I this credit.dm building permit shall theot z <br /> a�' GO/smoke Detector ® quaie to gpemi drawings specify pion <br /> P-1"X 2'-10" 64 5Q FT :Ur handler show the <br /> and shallapmlfy ventilation maximummatedbmWinstarleakageandshall Q <br /> 011 5Q FT / \ p en/ter( Haw E FICESCYI VCEQUIPMENT <br /> J 3a° HIGH EFFICIENCY HVACE UIPMENT 3e: 1.0 <br /> CO/Smoke Detector, \ rest Target CFM(825Pa Test Result CFM(a25Pa Gus,propane or oil-fired Gmace with minimum AFUE of94%,or 0 <br /> M <br /> --1 lz,_7_/___z \ Gas,propane or oiled-fired boiler with minimum AFUE of92% <br /> \ \ HuiiJing air linkage target:ACHnm�5.0-Ttated tankage:ACII.,,- To qualify to claim this cedit,the building permit thawing shall specify the option <br /> \ I being selected and shell specify the heating equipment type and the minimum <br /> Onane Renewable Energy Electric Power System equipment efficiency. W 3b° HIGH EFFICIENCY FNAC EQUIPMENT 3b: 1.0 <br /> / - System type: Rated annul generation Km Air-source heat pump with minimum HSPF of 9.0 <br /> J \ To qualify to claim this credit the building permit drawings shall specify the option _ <br /> O r- - sl being selected and shall specify the heating equipment type and the minimum <br /> / LP k O \ I equipment efficiency. Z > <br /> GO/Smoke Detector GO/Smoke Detector - _ 3cs HIGH EFFICIENCY HVAC EQUIPMENT'3c: 1.5 Ir I_ `y <br /> �/ - Table 406.2 oClosed-loop ground source heat pump;with a minimum COP of3.3 X <br /> / \ _ _ _ _, ` Energy Credits (2015 Code) Open loop water source heat pump with a maximum pumping hydraulic head of150 U_I <br /> OPTION DESCRIPTION CREDR(S) Estimated Coon lea and minimum COP of3.6 <br /> / _ - - To qualify m claim this credit,the building permit drawing shall specify the option <br /> lu EFFICIENT BUILDING ENVELOPE Ie: 0.5 �" <br /> • _ BEDROOM Pmcriptivc mmpliame is based on Table R402.1.1 with the following modifications: ti •ing lened and shall specify he hmnng equipment type and the minimum <br /> - Vertical fenasnetion U=0.2N 111011 ant EFFICIENCYeffncy. . <br /> / 1'-9"X 8'-1" _1 Floor R-38 ld" HIGH HVAC EQUIPMENT 1.0 'Cr <br /> bb 50 FT �,r� Slab on grade R-10 perinater and under entire slab Ductless Split System Heat Pumps,Zonal Control:In homes whom the primary space CO <br /> w ' Below grade slab R-10 perimeter and under mtim slab heating system is tonal electric hinting,a ductless heat pump synced shall be installed W <br /> ' BEDfOpM �' \ and uglifyt Heating to tnc Grgcst mac afthc noosing snit. <br /> - tl-t 1-- Compliance based on Section R402.1.4:Redoce the Total UA by 5%. To qualify to claim this ttedit the building permit drawing shall specify the option <br /> b'-1110N10" t1LL Ib EFFICIENT BUILDING ENVELOPE lb: 1.0 being selected and shall specify the heating equipment type and the minimum <br /> Prescriptive compliance is based on Table 0402.1.1 with the following modifications: equipment EFFICIENCY <br /> efficiency. <br /> 15 1Q FT \ O X N \ I, Vertical f vat onU=0.23 4 HIGIIEFFICIENCYHVAC DISTRIBUTION SYSTEM) 0 <br /> J c0 Wall R-21 plus RA All heating and cooling system components installed inside the conditioned space. <br /> - \\ V \ Floor A-3R This includes all equipment and distributor system components such as forced air <br /> BaSlasement g wall R-21 ins plus R-5 ci ducts,hydtvric piping,hydronic floor heating loop,convectors and radiators.All <br /> 1 I I Below <br /> gads slab <br /> R-1 poiperimeter end under entire slab combustion equipment shall be direct vent or sealed combustion. <br /> _ r�1 •I I Bela.grad slab R-10 p an and erect re entire slab <br /> / \ 11-a11 {-1 1 or For forted air ducts:A maximum of lO linear feet of ream duns and 5 linear feet of ` ` <br /> (f f• supply ducts may be Iocataao outside the conditioned space.All metallic ducts lo.ted v <br /> / Compliance based on Section R402.1 A:Reduce the Total UA by 15%. outside the conditioned space must have both transverse and longitudinal joints sealed <br /> 2(// le EFFICIENT BUILDING ENVELOPE to: 2.0 with mastic.If flex ducts are used.they cannot contain splices.Flee duct connections <br /> / \ \ t Prescriptive compliance is based on Table R402.1.1 with the following modifications) must be made with nylon straps and installed using a plastic snapping tensioning mot <br /> Venial fenestration U=0.22 Wets located outside the conditioned space must be insulated to a minimum of R-R. <br /> Ceiling and single-ra0cr orjoisl-vaulted R.9 edvanrnl Locoing system components in conditioned cowl spaces a not permitted under This <br /> Wood frame wall R-2l int plus R-12 ci ' (� <br /> 6'-1111 \ \ Fluor Basement <br /> option. �I <br /> \-'- \ Slab <br /> wall R-21 eripets R-12 ci Electric resistance heat and ductless heat pumps are not pertained under this option. a` ` o <br /> 'I ��I Slab on grade R-10 perimeter and unacrder m slab Direct combustion heating equipment with A£lJE less than 811°.is not pennined 3♦�J <br /> • 1-- I a� Below grade slab R-I O perimeter one under entire slab under this option. - <br /> I121 IILI�-f To qualify to claim this credit,the building permit drawing shall specify the option <br /> \ Compliance basal on Section R402.1.4:Reduce the Total UA by 30 a. being selected the <br /> ing specify the nearing equipment type and shall show the \ <br /> Id' EFFICIENT BUILDING ENVELOPE Id: 0.5 location of the hinting and aniline equipment and all the ductwork. <br /> Prescriptive Lymph..u based on Table R402.1.1 with the following modifications: <br /> AIRVertindKAGEiON RO0.� C I'TY O F EVE R ET � <br /> AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2a: 0.5 <br /> hour n ance boxed on R402.4.1.2:Reduce the tined air leakage to 3.0 air changes per <br /> bevrmaximum �/1 WED FOR PERM r°v� <br /> and Ta06. <br /> All whole house Residential <br /> tiara requirements shllbeas determineda horde Section M(maxi um 0 <br /> International Reridenrial Cede shall be tact with a high efficiency fen(maximum 0.35 <br /> wanvefig).nminterlockedwiththefurnacefan.Ventilationsystemstiringafume. Energy Credits (2015 Code) <br /> including an ECM motor ate allowed,provided that they are controlled to operate at `(� <br /> low speed in ventilation only mode. OPTION DESCRIPTION CREDIT(S) Estimated Cost U <br /> To qualify to claim this credit,the building permit drawing shall specify the option ('�t <br /> being selected and shall specify the maximum towed building air leakage and shall 6 RENEWABLE ELECTRIC ENERGY: 0.5 \ v <br /> show the quollfytng ventilation system. Foreach 1200 kWh of electricalgeneration per each housing unit provided annually <br /> 2b AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION 2b: I.o by on-site wind or solare equipment a 0.5 credit shall be allowed,up to 3 credits. <br /> Compliance based on Section R402.4.1.2)Reduce ho tested air leakage to 2.0 en For odor el shell be calculated as follows: , w <br /> changes per hour maximum For solar electric systems.the design shall be demonsaated o meet this requitement V \ <br /> and ♦ x <br /> using the National Renewable Energy Laboratory calculator PV WATEa. v <br /> A5 BUILT UPPER FLOOR - All whole house von Otien requirements as determined by Section M1507.3 of the 00 E Emden noting solar access shall be included on the plans. • <br /> intemnie anal Residential Code Aid]be men with a hoot=ev ry ventilation system For wind generation projects designs shall document annual power generation bused <br /> with minimum sensible heat recovery efficient'of0.70. on the following factors) <br /> • + <br /> To qualify to claim this credit,the building The wind turbine power curve,average annual wind sped at the rite:frequency <br /> (UNCHANGED) Ranro gpmnndrawlningaireakage the shall distribution of the wind speed at the site and height of the tower. <br /> being selected and'droll specify the maximum tested building air leakage and shall To qualify to claim this rndit the building permit drawing shell specify the option • <br /> snow the heat recovery ventilation system. beingleased and shall show the photovoltaic or wind turbine t selected p equipment type, <br /> prov1/4".1' WINDOW SCHEDULE & ENERGY mum documentation wind ,and include aealenatangfthe <br /> minimum natal energy power production. i <br />