Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2310-002 Description: Generator <br /> Applied: 10/2/2023 Approved: 10/2/2023 Site Address: 2301 FULTON AVE <br /> Issued: 10/5/2023 Finaled: 10/16/2023 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant: LIGHTNING RIDER ELECTRIC PLLC <br /> Parent Permit: Owner:CLARK THOMAS W <br /> Parent Project: Contractor: LIGHTNING RIDER ELECTRIC PLLC <br /> Details: <br /> Installing a standby generator <br /> SCHEDULED DATE COMPLETED DATE7ELEC <br /> PE INSPECTOR RESULT REMARKS <br /> 10/10/2023 10/10/2023 FINAL** MICHAEL CORRECTION eTRAKiT Inspection Request <br /> WICKLANDER REQUIRED <br /> Notes: <br /> 10/7/2023 9:23 AM LIGHTNING RIDER ELECTRIC PLLC <br /> Contact Name:LIGHTNING RIDER ELECTRIC PLLC <br /> Site Address:2301 FULTON AVE <br /> Phone:4252463669 <br /> e-Mail:johan@lightningriderelectric.com <br /> Grounded conductor must be bonded at the first overcurrent device,which in this case is the automatic transfer switch.The neutrals and grounds must <br /> be separated at the panel,and the main rounding electrode must be brought up into the ATS and bonded to the groundedelectrode conductor(neutral) <br /> 10/16/2023 10/16/2023 ELEC 10-FINAL** MICHAEL APPRVD-PERMIT eTRAKiT Inspection Request <br /> WICKLANDER FINAL <br /> Notes: <br /> 10/15/2023 5:01 PM LIGHTNING RIDER ELECTRIC PLLC <br /> Contact Name:LIGHTNING RIDER ELECTRIC PLLC <br /> Site Address:2301 FULTON AVE <br /> Phone:4252463669 <br /> e-Mail:johan@lightningriderelectric.com <br /> Corrections made approved final permit <br /> I <br /> Printed:Wednesday, 18 October,2023 1 of 1 <br /> SUPERION <br />